Angola Power EPC Market Size
Study Period | 2021 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2021 - 2022 |
CAGR | 2.05 % |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Angola Power EPC Market Analysis
The power EPC market in Angola is expected to witness a CAGR of more than 2.05% during the forecast period.
The market was negatively impacted by COVID-19 in 2020. However, it has now reached pre-pandemic levels.
- Over the medium term, ambitious government plans and targets for rapid urbanization, which are expected to require more power and a transmission network, are expected to drive the Angola power EPC market during the forecast period.
- On the other hand, lower private participation and underdeveloped grid infrastructure are expected to restrain the studied market during the forecast period.
- Nevertheless, Angola holds great potential for the renewable energy sector. The country has been planning to diversify its power generation from coal and oil to renewable. Thus, this is expected to provide a great opportunity for the power EPC market.
Angola Power EPC Market Trends
This section covers the major market trends shaping the Angola Power EPC Market according to our research experts:
Hydropower Generation to Witness Significant Growth
- Angola's hydropower potential is among the highest in Africa, estimated at 18.2 GW. The government aims to substantially grow its hydropower generation capacity from around 3,729 MW in 2021 to 9,000 MW by 2025.
- The country has exceptional hydro resources, with 159 sites identified in previous studies as having potential for large hydropower plants, in addition to those already under construction or decided upon.
- The Angolan government is also planning to open up the energy market for private investors in the near future, especially for smaller hydropower projects. The Angolan government is investing in a 343 km long transmission line connecting the north and south grids and transferring approximately 1,000 MW of primarily low-cost hydropower. It will become operational in 2023.
- The government is also planning to develop the hydropower industry by integrating hydropower plants with natural gas-fired power plants. This integration is assumed to enable a secure and competitive system, even during drought.
- In August 2022, Luachimo Hydroelectric Dam, a USD 212 million Chinese-financed project located in Angola's Lunda Norte province, was to begin operation. The approval tests of the equipment for the preparation of the start-up of the first two turbines have begun, according to the director of the project for the rehabilitation and expansion of the infrastructure. The first two turbines, each with the capacity to produce 17 megawatts of electricity, have been installed. The assembly of the other two, each with the same capacity, is over 60% complete.
- Thus, the great potential of hydropower, combined with the government efforts to develop the hydropower industry, is expected to provide hydropower power generation an excellent capability during the forecast period.
Ambitious Government Plans to Drive the Market
- Available generation capacity in Angola has grown significantly over the past years; however, power demand is still suppressed. Suppressed demand results in frequent power supply cuts and widespread use of generators for auto-consumption, with a greater incidence in the humid months due to air conditioning.
- To meet these challenges, the Angolan government has developed a series of policies and laws in the past years to define the main objectives and orientations of the energy and electric sectors. Angola's government now aims to adequately electrify every provincial and municipal capital and bring basic energy services to the country's population.
- The growth of generation capacity and the expansion of the grid, as well as the mobilization of private capital, are the long-term strategic axes established in the policy and strategy for National Energy Security, with an impact on the long-term development of the country and on the diversification of the national economy.
- In 2021, A memorandum of understanding for the collaborative building of the 600 MW Baynes Dam hydroelectric facility was signed by Namibia and Angola. Each nation would produce 300 MW of electricity in turn.
- Governments in Angola hope to reach a 60% electrification rate by 2025. As of 2021, the national rate was 45.9%, with significantly lower rates in rural areas. In the near term, Angola has ambitious but unsupported plans to develop renewable energy. By 2025, it plans to connect more than 800 megawatts to the grid.
- Electricity generation in Angola reached around 14.13 terawatt hours in 2021. Hydropower accounted for almost entirely the renewable-energy-generated electricity produced in the country.
- The government of Angola is developing small-scale off-grid projects that use fossil fuels and renewable energy sources. The transmission network of Angola is composed of three primary grid systems (northern, central, and southern) and solitary grids in the east. The provinces of Luanda, Uige, Bengo, Zaire, Malange, Kwanza Norte, and Kwanza Sul are covered by the northern grid's 400 kV and 220 kV lines. Benguela to Huambo and Bie 220kV lines are part of the central network.
- Therefore, such government initiatives are expected to drive the power EPC market during the forecast period.
Angola Power EPC Industry Overview
The Angola power EPC market is moderately fragmented. Some of the key players (in no particular order) include Isolux Corsan SA, Gesto-Energia SA, Anglo Belgian Corporation, AEE Power Corporation, and Siemens AG.
Angola Power EPC Market Leaders
-
Isolux Corsan, S.A.
-
Gesto-Energia S.A.
-
Anglo Belgian Corporation
-
AEE Power Corporation
-
Siemens AG
*Disclaimer: Major Players sorted in no particular order
Angola Power EPC Market News
- Aug 2022: In connection with a gas development project in the Lower Congo Basin off the coast of northwest Angola, the New Gas Consortium awarded Saipem three contracts. As part of the development of the offshore Quiluma and Maboqueiro fields, consortium members Azule Energy, Sonangol P&P, Chevron, and TotalEnergies have hired Saipem to handle engineering, procurement, and construction (EPC) tasks.
- Aug 2022: The Portuguese company MCA completed two photovoltaic parks in Benguela and Bafa Farta, Angola, generating 285 megawatts (MWp) of green electricity to benefit 1.8 million people. As part of the international consortium responsible for the project's development, MCA has led its execution phase in Engineering, Procurement, and Construction.
Angola Power EPC Market Report - Table of Contents
1. INTRODUCTION
- 1.1 Scope of the Study
- 1.2 Market Definition
- 1.3 Study Assumptions
2. EXECUTIVE SUMMARY
3. RESEARCH METHODOLOGY
4. MARKET OVERVIEW
- 4.1 Introduction
- 4.2 Installed Power Capacity Forecast in MW, till 2027
- 4.3 Primary Energy Consumption, by Fuel Type, 2021
- 4.4 Electricity Generation and Consumption Forecast, 2022-2027
- 4.5 Electricity Generation, by Fuel Type, 2022
- 4.6 Recent Trends and Developments
- 4.7 Government Policies and Regulations
-
4.8 Market Dynamics
- 4.8.1 Drivers
- 4.8.2 Restraints
- 4.9 Supply Chain Analysis
- 4.10 PESTLE Analysis
5. MARKET SEGMENTATION AND ANALYSIS (Qualitative Analysis)
-
5.1 Power Generation
- 5.1.1 Thermal
- 5.1.2 Hydropower
- 5.1.3 Renewables
- 5.2 Power Transmission and Distribution
6. COMPETITIVE LANDSCAPE
- 6.1 Mergers and Acquisitions, Joint Ventures, Collaborations, and Agreements
- 6.2 Strategies Adopted by Leading Players
-
6.3 Company Profiles
- 6.3.1 EPC Developers
- 6.3.1.1 Isolux Corsan SA
- 6.3.1.2 Gesto-Energia SA
- 6.3.1.3 Anglo Belgian Corporation
- 6.3.1.4 AEE Power Corporation
- 6.3.2 Original Equipment Manufacturers
- 6.3.2.1 General Electric Co.
- 6.3.2.2 AE Energia
- 6.3.2.3 Siemens AG
- 6.3.2.4 Andritz Hydro GmbH
- *List Not Exhaustive
7. MARKET OPPORTUNITIES AND FUTURE TRENDS
** Subject To AvailablityAngola Power EPC Industry Segmentation
Power EPC is a contract used to construct power generation projects by the private sector on large-scale, complex energy infrastructure projects. EPC stands for engineering, procurement, and commissioning. Engineering and procurement involve the detailed engineering design of a project and procuring all necessary equipment and raw materials. Construction is related to delivering a functional facility to the client.
The Angola Power EPC market is segmented by power generation and power transmission and distribution. By power generation, the market is segmented into thermal, hydropower, and renewables. For each segment, the market sizing and forecasts have been done based on revenue (USD billion).
Power Generation | Thermal |
Hydropower | |
Renewables |
Angola Power EPC Market Research FAQs
What is the current Angola Power EPC Market size?
The Angola Power EPC Market is projected to register a CAGR of greater than 2.05% during the forecast period (2024-2029)
Who are the key players in Angola Power EPC Market?
Isolux Corsan, S.A., Gesto-Energia S.A., Anglo Belgian Corporation, AEE Power Corporation and Siemens AG are the major companies operating in the Angola Power EPC Market.
What years does this Angola Power EPC Market cover?
The report covers the Angola Power EPC Market historical market size for years: 2021, 2022 and 2023. The report also forecasts the Angola Power EPC Market size for years: 2024, 2025, 2026, 2027, 2028 and 2029.
Angola Power EPC Industry Report
Statistics for the 2024 Angola Power EPC market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Angola Power EPC analysis includes a market forecast outlook 2029 and historical overview. Get a sample of this industry analysis as a free report PDF download.