Market Size of Brazil Data Center Construction Industry
Study Period | 2024 - 2030 |
Base Year For Estimation | 2023 |
Market Size (2024) | USD 0.74 Billion |
Market Size (2030) | USD 1.42 Billion |
CAGR (2024 - 2030) | 13.60 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Brazil Data Center Construction Market Analysis
The Brazil Data Center Construction Market size is estimated at USD 0.74 billion in 2024, and is expected to reach USD 1.42 billion by 2030, growing at a CAGR of 13.60% during the forecast period (2024-2030).
Under Construction IT Load Capacity: The upcoming IT load capacity of the Brazil data center construction market is expected to reach 1205 MW in six years.
Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 4.6 million sq. ft in six years.
Planned Racks: The country's total number of racks to be installed is expected to reach 231,802 units in six years.
Planned Submarine Cables: Close to 15 submarine cable systems connect Brazil; many are under construction. One such submarine cable, estimated to be built by the end of the current year, is Firmina, which stretches over 14517 km with landing points in Las Toninas, Argentina, Praia Grande, Brazil, Myrtle Beach, SC, United States, Punta del Este, Uruguay.
Brazil Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with them. Under data center construction, we track the capital expenditure incurred while building the existing DC facilities and estimate the future capex based on upcoming DC facilities.
Brazil's Data Center Construction Market is segmented by infrastructure (electrical infrastructure (UPS systems, other electrical infrastructure), mechanical infrastructure (cooling systems, racks, other mechanical infrastructure), and other infrastructure), by end-user (banking, financial services, and insurance, IT and telecommunications, government, healthcare, and other end users). The market sizes and forecasts are provided in terms of value in USD for all the above segments.
By Infrastructure | |||||
| |||||
| |||||
Other Infrastructures |
By End User | |
IT & Telecommunication | |
BFSI | |
Government | |
Healthcare | |
Other End Users |
Brazil Data Center Construction Market Size Summary
The Brazil Data Center Construction Market is poised for significant growth, driven by the increasing demand for cloud services and advancements in technologies such as artificial intelligence, big data, and blockchain. The market is characterized by a robust expansion in IT load capacity, raised floor space, and the installation of racks, with substantial investments in infrastructure to support these developments. The cloud and BFSI sectors are expected to dominate the market share, while the manufacturing segment is anticipated to experience the fastest growth. The construction of submarine cables, like the Firmina, further underscores the region's commitment to enhancing its digital infrastructure.
Key cities like Sao Paulo and Rio de Janeiro are central to this growth, given their economic significance and technological advancements. Sao Paulo, as a major economic hub, and Rio de Janeiro, with its financial prominence, provide a conducive environment for data center expansion. The Rest of Brazil, including regions like Ceara, is also witnessing digital transformation efforts, supported by international investments. The market is fairly consolidated, with major players such as AECOM, NetApp, Oracle, and others actively contributing to the construction and development of data centers. Recent investments by companies like Ascenty and Equinix highlight the ongoing commitment to expanding data center capabilities in Brazil.
Brazil Data Center Construction Market Size - Table of Contents
-
1. MARKET INSIGHTS
-
2. MARKET DYNAMICS
-
3. MARKET SEGMENTATION
-
3.1 By Infrastructure
-
3.1.1 Electrical Infrastructure
-
3.1.1.1 UPS Systems
-
3.1.1.2 Other Electrical Infrastructures
-
-
3.1.2 Mechanical Infrastructure
-
3.1.2.1 Cooling Systems
-
3.1.2.2 Racks
-
3.1.2.3 Other Mechanical Infrastructures
-
-
3.1.3 Other Infrastructures
-
-
3.2 By End User
-
3.2.1 IT & Telecommunication
-
3.2.2 BFSI
-
3.2.3 Government
-
3.2.4 Healthcare
-
3.2.5 Other End Users
-
-
Brazil Data Center Construction Market Size FAQs
How big is the Brazil Data Center Construction Market?
The Brazil Data Center Construction Market size is expected to reach USD 0.74 billion in 2024 and grow at a CAGR of 13.60% to reach USD 1.42 billion by 2030.
What is the current Brazil Data Center Construction Market size?
In 2024, the Brazil Data Center Construction Market size is expected to reach USD 0.74 billion.