Market Size of Data Center Construction Industry
Study Period | 2019 - 2029 |
Market Size (2024) | USD 262.20 Billion |
Market Size (2029) | USD 355.80 Billion |
CAGR (2024 - 2029) | 7.30 % |
Fastest Growing Market | Asia Pacific |
Largest Market | North America |
Major Players*Disclaimer: Major Players sorted in no particular order |
Data Center Construction Market Analysis
The Data Center Construction Market size is estimated at USD 262.20 billion in 2024, and is expected to reach USD 355.80 billion by 2030, growing at a CAGR of 7.30% during the forecast period (2024-2030).
- Under Construction IT Load Capacity: The upcoming IT load capacity of the Global data center market is expected to reach above 73,000 MW by 2029.
- Under Construction Raised Floor Space: The global construction of raised floor areas is expected to exceed 285 million sq. ft. by 2029.
- Planned Racks: The total number of racks to be installed is expected to reach more than 14 million units by 2029. North America is expected to house the maximum number of racks by 2029.
- Hyper-scale data centers are being built more often worldwide to store massive volumes of data, opening up lucrative opportunities for business players. Many industries use hyper-scale data centers to increase computing power, memory, networking capabilities, and storage resources. The ability to effectively scale up computer workloads at a large scale and the physical infrastructure and distribution systems supporting the data centers are two of the many components of hyper-scale data centers.
- Moreover, According to Flexera State of the Cloud Report 2023, 72% of companies' respondents stated they had deployed a hybrid cloud in their business. Migrating to hybrid cloud solutions often comes at the expense of operating private and public clouds.
Data Center Construction Industry Overview
Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.
The global data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels and components, others)), power backup solution (ups, generators), service – design & consulting, integration, support & maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, in-row and in-rack cooling)), racks, other mechanical infrastructure)), general construction)), by Tier Type (Tier 1 and 2, Tier 3, and Tier 4), by end user (banking, financial services and insurance, it and telecommunications, government and defense, healthcare, and other end user), and geography (North America, Europe, Asia-Pacific, Latin America, and the Middle East and Africa). The market sizes and forecasts are provided in USD values for all the above segments.
Market Segmentation - By Infrastructure | ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
General Construction |
Market Segmentation - By Tier Type | |
Tier-I and II | |
Tier-III | |
Tier-IV |
Market Segmentation - By End User | |
Banking, Financial Services, and Insurance | |
IT and Telecommunications | |
Government and Defense | |
Healthcare | |
Other End Users |
Market Segmentation - By Region | |
North America | |
Europe | |
Asia-Pacific | |
Middle East and Africa | |
Latin America |
Data Center Construction Market Size Summary
The data center construction market is poised for significant growth, driven by the increasing reliance on data centers to meet the IT demands of enterprises in an era of on-demand services. The evolution of data centers has been propelled by the need for enhanced data management, backup, recovery, and productivity tools. The rise of hyper-scale data centers, which offer substantial computing power, memory, and storage capabilities, is a key factor in this expansion. These facilities are becoming more prevalent globally, providing lucrative opportunities for industry players. The shift towards hybrid cloud solutions, as indicated by a substantial percentage of companies adopting such models, further underscores the growing demand for data centers. This trend is supported by government initiatives promoting digital economies and advancements in storage infrastructure, such as those introduced by Seagate Technology and Phison Electronics.
Despite the promising growth prospects, the market faces challenges related to environmental impact, high construction costs, and workforce issues, which could hinder the establishment of new data centers, particularly for small and medium enterprises. The COVID-19 pandemic initially disrupted construction activities and supply chains, but post-pandemic demand for data capacity has surged, leading to a resurgence in data center construction. North America remains a dominant region, bolstered by a robust economy and advanced network infrastructure, with significant investments from major cloud service providers. The increasing need for data security and privacy, alongside investments in metro infrastructure, further fuels market expansion. The market is characterized by intense competition among major players, with ongoing technological advancements and strategic partnerships driving growth and market presence.
Data Center Construction Market Size - Table of Contents
-
1. MARKET SEGMENTATION
-
1.1 Market Segmentation - By Infrastructure
-
1.1.1 Market Segmentation - Electrical Infrastructure
-
1.1.1.1 Power Distribution Solution
-
1.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.1.2 Transfer Switches
-
1.1.1.1.2.1 Static
-
1.1.1.1.2.2 Automatic (ATS)
-
-
1.1.1.1.3 Switchgear
-
1.1.1.1.3.1 Low-voltage
-
1.1.1.1.3.2 Medium-voltage
-
-
1.1.1.1.4 Power Panels and Components
-
1.1.1.1.5 Others
-
-
1.1.1.2 Power Back up Solutions
-
1.1.1.2.1 UPS
-
1.1.1.2.2 Generators
-
-
1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance
-
-
1.1.2 Market Segmentation - By Mechanical Infrastructure
-
1.1.2.1 Cooling Systems
-
1.1.2.1.1 Immersion Cooling
-
1.1.2.1.2 Direct-To-Chip Cooling
-
1.1.2.1.3 Rear Door Heat Exchanger
-
1.1.2.1.4 In-row and In-rack Cooling
-
-
1.1.2.2 Racks
-
1.1.2.3 Other Mechanical Infrastructure
-
-
1.1.3 General Construction
-
-
1.2 Market Segmentation - By Tier Type
-
1.2.1 Tier-I and II
-
1.2.2 Tier-III
-
1.2.3 Tier-IV
-
-
1.3 Market Segmentation - By End User
-
1.3.1 Banking, Financial Services, and Insurance
-
1.3.2 IT and Telecommunications
-
1.3.3 Government and Defense
-
1.3.4 Healthcare
-
1.3.5 Other End Users
-
-
1.4 Market Segmentation - By Region
-
1.4.1 North America
-
1.4.2 Europe
-
1.4.3 Asia-Pacific
-
1.4.4 Middle East and Africa
-
1.4.5 Latin America
-
-
Data Center Construction Market Size FAQs
How big is the Data Center Construction Market?
The Data Center Construction Market size is expected to reach USD 262.20 billion in 2024 and grow at a CAGR of 7.30% to reach USD 355.80 billion by 2029.
What is the current Data Center Construction Market size?
In 2024, the Data Center Construction Market size is expected to reach USD 262.20 billion.