Denmark Data Center Construction Market Size (2024 - 2029)

The Denmark data center construction market is anticipated to experience significant growth, with a robust expansion in its market size over the forecast period. This growth is driven by an increase in IT load capacity and the construction of additional raised floor areas. The market is also set to see a substantial rise in the number of racks installed, particularly concentrated in Copenhagen. Furthermore, the development of submarine cable systems, including several under construction, is expected to enhance connectivity and support the market's expansion.

Denmark Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)

Denmark Data Center Construction Market Size

Denmark Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Forecast Data Period 2024 - 2030
Market Size (2024) USD 0.94 Billion
Market Size (2030) USD 1.98 Billion
CAGR (2024 - 2030) 13.17 %
Market Concentration Medium

Major Players

Denmark Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Denmark Data Center Construction Market Analysis

The Denmark Data Center Construction Market size is estimated at USD 0.94 billion in 2024, and is expected to reach USD 1.98 billion by 2030, growing at a CAGR of 13.17% during the forecast period (2024-2030).

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Danish data center construction market is expected to reach more than 300 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to be more than 1.3 thousand sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach more than 63.9 thousand units by 2030. Copenhagen is expected to house the maximum number of racks by 2030.
  • Planned Submarine Cables: There are close to 20 submarine cable systems connecting Denmark, and many are under construction.

Denmark Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Danish data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solution (PDU, transfer switches, switchgear, power panels and components, and others), power back-up solution (UPS and generators), and service (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

By Infrastructure
By Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Others
By Electrical Infrastructure Power Back-up Solutions UPS
Generators
By Electrical Infrastructure Service - Design and Consulting, Integration, Support and Maintenance
By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
By Mechanical Infrastructure Racks
Other Mechanical Infrastructure
General Construction
By Tier Type
Tier 1 and 2
Tier 3
Tier 4
By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region or Segment?
Customize Now

Denmark Data Center Construction Market Size Summary

The Denmark Data Center Construction Market is experiencing robust growth, driven by increasing demand for cloud computing and e-commerce services. The market is characterized by a significant expansion in IT load capacity and raised floor area, with Copenhagen emerging as a major hub due to its strategic location and business opportunities. The city's connectivity to continental Europe, Scandinavia, and the Baltic States enhances its appeal, facilitating trade and attracting investments. The presence of submarine cable systems further supports the infrastructure needed for data centers, enabling efficient data transmission and connectivity. The market is semi-consolidated, with key players like AECOM, Arup Group Limited, Legrand, Atos, and Arista Networks contributing to the development of advanced data center solutions, including innovative cooling technologies.

The cloud segment is poised for substantial growth, with a significant share of companies adopting cloud computing services, driven by advancements in artificial intelligence, big data, and blockchain technologies. The Rest of Denmark, including cities like Aarhus and Esbjerg, is also witnessing increased activity, with new fiber routes and data center infrastructure being developed to meet future traffic demands. The market's expansion is supported by strategic acquisitions and investments, such as Penta Infra's entry into the Nordic market and STACK Infrastructure's development of a new data center campus. These developments underscore Denmark's growing importance as a key player in the global data center construction industry, with a focus on sustainability and cutting-edge technology.

Explore More

Denmark Data Center Construction Market Size - Table of Contents

1. MARKET SEGMENTATION

  • 1.1 By Infrastructure
    • 1.1.1 By Electrical Infrastructure
    • 1.1.1.1 Power Distribution Solution
    • 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
    • 1.1.1.1.2 Transfer Switches
    • 1.1.1.1.2.1 Static
    • 1.1.1.1.2.2 Automatic (ATS)
    • 1.1.1.1.3 Switchgear
    • 1.1.1.1.3.1 Low-voltage
    • 1.1.1.1.3.2 Medium-voltage
    • 1.1.1.1.4 Power Panels and Components
    • 1.1.1.1.5 Others
    • 1.1.1.2 Power Back-up Solutions
    • 1.1.1.2.1 UPS
    • 1.1.1.2.2 Generators
    • 1.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance
    • 1.1.2 By Mechanical Infrastructure
    • 1.1.2.1 Cooling Systems
    • 1.1.2.1.1 Immersion Cooling
    • 1.1.2.1.2 Direct-to-Chip Cooling
    • 1.1.2.1.3 Rear Door Heat Exchanger
    • 1.1.2.1.4 In-row and In-rack Cooling
    • 1.1.2.2 Racks
    • 1.1.2.3 Other Mechanical Infrastructure
    • 1.1.3 General Construction
  • 1.2 By Tier Type
    • 1.2.1 Tier 1 and 2
    • 1.2.2 Tier 3
    • 1.2.3 Tier 4
  • 1.3 By End User
    • 1.3.1 Banking, Financial Services, and Insurance
    • 1.3.2 IT and Telecommunications
    • 1.3.3 Government and Defense
    • 1.3.4 Healthcare
    • 1.3.5 Other End Users

Denmark Data Center Construction Market Research FAQs

How big is the Denmark Data Center Construction Market?

The Denmark Data Center Construction Market size is expected to reach USD 0.94 billion in 2024 and grow at a CAGR of 13.17% to reach USD 1.98 billion by 2030.

What is the current Denmark Data Center Construction Market size?

In 2024, the Denmark Data Center Construction Market size is expected to reach USD 0.94 billion.