France Data Center Construction Market Size
Study Period | 2019 - 2030 |
Base Year For Estimation | 2023 |
Market Size (2024) | USD 4.81 Billion |
Market Size (2030) | USD 7.68 Billion |
CAGR (2024 - 2030) | 8.11 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
France Data Center Construction Market Analysis
The France Data Center Construction Market size is estimated at USD 4.81 billion in 2024, and is expected to reach USD 7.68 billion by 2030, growing at a CAGR of 8.11% during the forecast period (2024-2030).
- Under Construction IT Load Capacity: The upcoming IT load capacity of the French data center construction market is expected to reach more than 1700 MW by 2030.
- Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by more than 6.3 thousand sq. ft by 2029.
- Planned Racks: The country's total number of racks to be installed is expected to reach more than 300 thousand units by 2030. Paris (Ile-De-France) is expected to house the maximum number of racks by 2030.
- Planned Submarine Cables: There are more than 25 submarine cable systems connecting France, and many are under construction.
France Data Center Construction Market Trends
Tier 3 Data Centers were Expected to Record Significant Market Share in 2023
- France's data center construction market is on a consistent growth trajectory, driving service providers to adopt tier 3 standards. This shift has culminated in the proliferation of tier 3 colocation facilities nationwide. As of 2023, France boasts a tally exceeding 700 tier 3 data centers, with an additional 15+ under construction, all earmarked for tier 3 certification. Notably, Paris (Ile-De-France) stands out as the epicenter, hosting the lion's share of the nation's tier 3 data centers, closely trailed by other regions in France.
- Key players in the tier 3 data center (DC) construction industry include Equinix, Digital Realty (Interxion), Telehouse, Colt Technologies, DTech, Thésée DataCenter, and Castle IT. The bulk of this construction is expected to be centered around Paris, specifically in Ile-De-France.
- In the coming years, facilities in tier 1 and tier 2 are expected to witness a waning demand and a decline in growth. This trend is primarily attributed to persistent and erratic outages. Consequently, a significant portion of users is expected to transition toward tier 3 and 4 facilities. This shift is fueled by the rising need for robust data storage, processing, and analysis capabilities.
- The surge in digitization is set to propel significant growth for tier 3 data centers in the near future. Drivers include expanding smartphone penetration, companies' push for top-tier content, heightened graphics demands in online gaming, and a swelling user base for online shopping and digital payments in France. Consequently, the nation is witnessing a rising demand for new data centers to meet its escalating data processing requirements.
The IT and Telecommunications Segment to Record Significant Market Share
- France boasts one of the world's largest ICT markets, with over 10,000 IT companies currently operating and new entrants joining the industry regularly. This growth is primarily fueled by the widespread adoption of cloud services and the escalating integration of AI and ML technologies by businesses.
- The French government is actively investing in digitalizing its economy. A pivotal move is its commitment of EUR 20 billion (USD 22.25 billion) to extend high-speed broadband coverage, aiming to connect every French household within the next decade. Additionally, as part of the "Investments into the Future" project, EUR 150 million (USD 166.91 million) is earmarked for research and development, with a specific focus on enhancing security and advancing cloud computing.
- The French government's Digital Transformation Plan and the French Tech initiative are pivotal in fostering innovation and digital evolution. These measures not only bolster the IT services industry but also spur French enterprises to embrace cutting-edge technologies.
- Iliad SA, a telecom provider, launched the "Iliad France 5G Expansion" initiative to bolster 5G infrastructure in France. This initiative not only bolsters the French 5G mobile infrastructure but also champions ultra-fast data transfers through its high-capacity network. Importantly, it closely mirrors the objectives outlined in the 5G for Europe Action Plan. Moreover, it echoes the ambitions of the Electronic Communication Code, emphasizing the push for 5G rollouts and fostering infrastructure competition. This initiative is in sync with the 2030 EU Digital Compass targets, further underlining its strategic alignment. These concerted efforts are not only propelling growth in the country's data centers but also encouraging operators to expand or establish new centers to meet escalating data processing demands.
France Data Center Construction Industry Overview
The French data center construction market is moderately consolidated, with key players such as Bouygues Construction and Mercury Engineering. Notably, major data center corporations are intensifying their investments in France, with a primary focus on expansion and building new facilities. This uptick in investments directly correlates with the growing demand for advanced data processing and storage capabilities.
April 2023: Data4 unveiled its blueprint for a cutting-edge data center in Paris. The blueprint entails the construction of 8 data centers sprawled across a 22-hectare plot in Nozay, Essone, located to the southwest of Paris. This project investment is around EUR 1 billion (USD 1.18 billion). Initiatives of this scale not only underscore Data4's commitment but also open up avenues for vendors eyeing the market.
France Data Center Construction Market Leaders
-
Bouygues Construction
-
TPF Ingenierie
-
Mercury Engineering
-
LPI Group
-
M+W Group
*Disclaimer: Major Players sorted in no particular order
France Data Center Construction Market News
- May 2024: The French telecommunications group Iliad announced that it is set to channel billions of euros into its OpCore data center division. Iliad has outlined plans to invest EUR 2.5 billion (equivalent to USD 2.71 billion) into organic expansions, with backing from both Iliad and a forthcoming financial collaborator. Additionally, the company alluded to potential investments in "opportunistic M&A."
- February 2024: NTT Ltd revealed plans to construct and manage its inaugural data center campus in Paris, a pivotal hub for European data centers.
France Data Center Construction Market Report - Table of Contents
1. INTRODUCTION
- 1.1 Study Assumptions And Market Definition
- 1.2 Scope of the Study
2. RESEARCH METHODOLOGY
- 2.1 Research Framework
- 2.2 Secondary Research
- 2.3 Primary Research
- 2.4 Data Triangulation and Insight Generation
3. EXECUTIVE SUMMARY
4. MARKET INSIGHT
- 4.1 Market Overview
-
4.2 Market Dynamics
- 4.2.1 Market Drivers
- 4.2.1.1 Digital Transformation and Rising Demand for Managed Cloud Services to Drive Market Growth
- 4.2.1.2 5G Developments Fueling Data Center Investments
- 4.2.2 Market Restraints
- 4.2.2.1 Rising Cost and Regulatory Pressure to Hinder Market Growth
-
4.3 Industry Attractiveness - Porter's Five Forces Analysis
- 4.3.1 Bargaining Power of Suppliers
- 4.3.2 Bargaining Power of Consumers
- 4.3.3 Threat of New Entrants
- 4.3.4 Threat of Substitutes
- 4.3.5 Intensity of Competitive Rivalry
-
4.4 Key France Data Center Construction Statistics
- 4.4.1 Number of Data Centers in France, 2022 and 2023
- 4.4.2 Data Center Under Construction in France, in MW, 2024 - 2029
- 4.4.3 Average Capex and Opex for the French Data Center Construction
- 4.4.4 Data Center Power Capacity Absorption in MW, Selected Cities, France, 2022 and 2023
- 4.4.5 The Top CAPEX Spenders on Data Center Infrastructure in France
5. MARKET SEGMENTATION
-
5.1 By Infrastructure
- 5.1.1 By Electrical Infrastructure
- 5.1.1.1 Power Distribution Solution
- 5.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
- 5.1.1.1.2 Transfer Switches
- 5.1.1.1.2.1 Static
- 5.1.1.1.2.2 Automatic (ATS)
- 5.1.1.1.3 Switchgear
- 5.1.1.1.3.1 Low-voltage
- 5.1.1.1.3.2 Medium-voltage
- 5.1.1.1.4 Power Panels and Components
- 5.1.1.1.5 Others
- 5.1.1.2 Power Back-up Solutions
- 5.1.1.2.1 UPS
- 5.1.1.2.2 Generators
- 5.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance
- 5.1.2 By Mechanical Infrastructure
- 5.1.2.1 Cooling Systems
- 5.1.2.1.1 Immersion Cooling
- 5.1.2.1.2 Direct-to-Chip Cooling
- 5.1.2.1.3 Rear Door Heat Exchanger
- 5.1.2.1.4 In-row and In-rack Cooling
- 5.1.2.2 Racks
- 5.1.2.3 Other Mechanical Infrastructure
- 5.1.3 General Construction
-
5.2 By Tier Type
- 5.2.1 Tier 1 and 2
- 5.2.2 Tier 3
- 5.2.3 Tier 4
-
5.3 By End User
- 5.3.1 Banking, Financial Services, and Insurance
- 5.3.2 IT and Telecommunications
- 5.3.3 Government and Defense
- 5.3.4 Healthcare
- 5.3.5 Other End Users
6. COMPETITIVE LANDSCAPE
-
6.1 Company Profiles
- 6.1.1 Bouygues Construction
- 6.1.2 TPF Ingenierie
- 6.1.3 Mercury Engineering
- 6.1.4 LPI Group
- 6.1.5 M+W Group
- 6.1.6 JERLAURE
- 6.1.7 Eiffage
- 6.1.8 CAP INGELEC
- 6.1.9 APL Data Center
- 6.1.10 Artelia Group
- *List Not Exhaustive
7. INVESTMENT ANALYSIS
8. MARKET OPPORTUNITIES AND FUTURE TRENDS
9. ABOUT US
- 9.1 Industries Covered
- 9.2 Illustrative List of Clients in the Industry
- 9.3 Our Customized Research Capabilities
France Data Center Construction Industry Segmentation
Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.
The French data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solution (PDU, transfer switches, switchgear, power panels and components, and others), power back-up solution (UPS and generators), and service (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The Market Sizes and Forecasts are Provided in Terms of Value (USD) and Volume () for all the Above Segments
By Infrastructure | By Electrical Infrastructure | Power Distribution Solution | PDU - Basic and Smart - Metered and Switched Solutions | |
Transfer Switches | Static | |||
Automatic (ATS) | ||||
Switchgear | Low-voltage | |||
Medium-voltage | ||||
Power Panels and Components | ||||
Others | ||||
By Infrastructure | By Electrical Infrastructure | Power Back-up Solutions | UPS | |
Generators | ||||
By Infrastructure | By Electrical Infrastructure | Service - Design and Consulting, Integration, Support and Maintenance | ||
By Infrastructure | By Mechanical Infrastructure | Cooling Systems | Immersion Cooling | |
Direct-to-Chip Cooling | ||||
Rear Door Heat Exchanger | ||||
In-row and In-rack Cooling | ||||
By Infrastructure | By Mechanical Infrastructure | Racks | ||
Other Mechanical Infrastructure | ||||
By Infrastructure | General Construction | |||
By Tier Type | Tier 1 and 2 | |||
Tier 3 | ||||
Tier 4 | ||||
By End User | Banking, Financial Services, and Insurance | |||
IT and Telecommunications | ||||
Government and Defense | ||||
Healthcare | ||||
Other End Users |
France Data Center Construction Market Research FAQs
How big is the France Data Center Construction Market?
The France Data Center Construction Market size is expected to reach USD 4.81 billion in 2024 and grow at a CAGR of 8.11% to reach USD 7.68 billion by 2030.
What is the current France Data Center Construction Market size?
In 2024, the France Data Center Construction Market size is expected to reach USD 4.81 billion.
Who are the key players in France Data Center Construction Market?
Bouygues Construction, TPF Ingenierie, Mercury Engineering, LPI Group and M+W Group are the major companies operating in the France Data Center Construction Market.
What years does this France Data Center Construction Market cover, and what was the market size in 2023?
In 2023, the France Data Center Construction Market size was estimated at USD 4.42 billion. The report covers the France Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022 and 2023. The report also forecasts the France Data Center Construction Market size for years: 2024, 2025, 2026, 2027, 2028, 2029 and 2030.
France Data Center Construction Industry Report
Statistics for the 2024 France Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. France Data Center Construction analysis includes a market forecast outlook to for 2024 to (2024to2030 and historical overview. Get a sample of this industry analysis as a free report PDF download.