Germany Data Center Construction Market Size (2024 - 2029)

The Germany data center construction market is anticipated to experience growth over the forecast period, driven by an increase in IT load capacity and the expansion of raised floor areas. This growth trajectory is supported by the installation of a significant number of racks and the development of submarine cable systems, enhancing connectivity. The market's expansion reflects the country's strategic investments in infrastructure to accommodate rising data demands.

Market Size of Germany Data Center Construction Industry

Single User License

$4750

Team License

$5250

Corporate License

$8750

Book before:
Germany Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Market Size (2024) USD 6.70 Billion
Market Size (2030) USD 11.06 Billion
CAGR (2024 - 2030) 8.73 %
Market Concentration Medium

Major Players

Germany Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Need a report that reflects how COVID-19 has impacted this market and its growth?

Single User License

$4750

Team License

$5250

Corporate License

$8750

Book before:

Germany Data Center Construction Market Analysis

The Germany Data Center Construction Market size is estimated at USD 6.70 billion in 2024, and is expected to reach USD 11.06 billion by 2030, growing at a CAGR of 8.73% during the forecast period (2024-2030).

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the German data center construction market is expected to reach more than 2400 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by more than 11.8 thousand sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach more than 590 thousand units by 2030. Moscow is expected to house the maximum number of racks by 2030.
  • Planned Submarine Cables: Close to 7 submarine cable systems are connecting Germany, and many are under construction.

Germany Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The German data center construction market is segmented by infrastructure (electrical infrastructure [power distribution solution (PDU, transfer switches, switchgear, power panels and components, and others), power back-up solution (UPS and generators), and service (design and consulting, integration, and support and maintenance)], mechanical infrastructure [cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure], and general construction), tier type (tier 1 and 2, tier 3, and tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

By Infrastructure
By Electrical Infrastructure
Power Distribution Solution
PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low-Voltage
Medium-Voltage
Power Panels and Components
Others
Power Back-up Solutions
UPS
Generators
Service - Design & Consulting, Integration, Support & Maintenance
By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-To-Chip Cooling
Rear Door Heat Exchanger
In-Row and In-Rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
By Tier Type
Tier 1 and 2
Tier 3
Tier 4
By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

Germany Data Center Construction Market Size Summary

The Germany data center construction market is poised for steady growth, driven by increasing demand for IT infrastructure across various sectors such as manufacturing, BFSI, and government services. The market is characterized by a semi-consolidated landscape with key players like Arup Group, Schneider Electric, and Hewlett Packard Enterprise actively participating in the development and expansion of data centers. The rise in automation, particularly in the manufacturing sector, is a significant contributor to the growing IT load capacity, with Germany leading in robot density and automation services. This trend is further supported by the government's initiatives in smart city development, which are enhancing digital transactions and online government services, thereby increasing the demand for data center capacity.

Frankfurt stands out as a major hub for data center construction, fueled by innovative city projects and a burgeoning IT business environment. The city's focus on smart city initiatives, including smart lighting and pollution monitoring, alongside the growing need for digitized applications, is driving the demand for increased IT load and rack installations. The market is also witnessing strategic investments, such as CyrusOne's acquisition of an office complex in Frankfurt to develop a data center campus, which underscores the ongoing opportunities for market players. Additionally, the expansion of colocation services, as seen with Deft's partnership with Digital Realty, highlights the dynamic nature of the market and its potential for further growth.

Explore More

Germany Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 By Infrastructure

      1. 1.1.1 By Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low-Voltage

            2. 1.1.1.1.3.2 Medium-Voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Others

        2. 1.1.1.2 Power Back-up Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance

      2. 1.1.2 By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-To-Chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-Row and In-Rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 By Tier Type

      1. 1.2.1 Tier 1 and 2

      2. 1.2.2 Tier 3

      3. 1.2.3 Tier 4

    3. 1.3 By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

Germany Data Center Construction Market Size FAQs

The Germany Data Center Construction Market size is expected to reach USD 6.70 billion in 2024 and grow at a CAGR of 8.73% to reach USD 11.06 billion by 2030.

In 2024, the Germany Data Center Construction Market size is expected to reach USD 6.70 billion.

Germany Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)