Ireland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)

The Ireland Data Center Construction Market is Segmented by Tier Type (Tier 1 and 2, Tier 3, and Tier 4), by Data Center Size (Small, Medium, Large, Massive, and Mega), by Infrastructure (Cooling Infrastructure (Air-Based Cooling, Liquid-Based Cooling, Evaporative Cooling), Power Infrastructure (UPS Systems, Generators, Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, and Other Infrastructure), and End User ( IT & Telecommunication, BFSI, Government, Healthcare, and Other End User). The Market Sizes and Forecasts are Provided in Values of USD for all the Above Segments.

Ireland Data Center Construction Market Size

Ireland Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Forecast Data Period 2024 - 2029
Historical Data Period 2019 - 2022
CAGR (2024 - 2030) 8.00 %
Market Concentration High

Major Players

Ireland Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Compare market size and growth of Ireland Data Center Construction Market with other markets in Technology, Media and Telecom Industry

Automation

Digital Commerce

Electronics

Information Technology

Media and Entertainment

Security & Surveillance

Ireland Data Center Construction Market Analysis

The Ireland Data Center Construction Market is expected to register a CAGR of 8% during the forecast period.

  • The upcoming IT load capacity of the Ireland data center construction market is expected to reach 1475.4 MW by 2029.
  • The country's construction of raised floor area is expected to increase by 8.2 million sq. ft by 2029.
  • The country's total number of racks to be installed is expected to reach 412121 units by 2029.
  • There are close to 12 submarine cable systems connecting Ireland, and many are under construction. One such submarine cable, estimated to be built by the end of 2025, is Celtic Norse, which stretches over 2008 Kilometers with landing points in Killala, Ireland.

Ireland Data Center Construction Market Trends

IT and Telecom to have significant market share

  • The Ireland data center construction market is being driven by increasing cloud usage across major enterprises as a result of advancements in technology. An industry survey suggests that a 10% increase in cloud adoption by the Irish public sector could yield economic benefits of EUR 473 million (USD 558 million) annually.
  • In terms of investment, Amazon Web Services (AWS) announced plans to invest in a new campus in Charlemont Square to accommodate its cloud computing workforce, which was scheduled to open in September 2022.
  • Overall, the cloud is expected to exhibit substantial growth as a trend. Furthermore, Ireland underwent a remarkable transformation in digital government services between 2021 and 2022. E-government users increased from 67% of internet users to 92%. The public service comprises a diverse range of government entities. The portal currently links to over 8,800 datasets from approximately 100 publishers.
  • Overall, the government is launching a new EUR 85 million fund to help businesses progress in their digital journey and develop new products, services, and processes. This scenario is expected to significantly drive the adoption of data centers within the public sector.
Ireland Data Center Construction Market, CAGR %, By End User, 2023-2029

Dublin to host many data center construction in the country

  • Currently, Dublin is the only city that has a colocation zonal area and occupies full market share. The western suburbs of Dublin have become an advantageous place to use fresh air to cool servers. It is home to a cluster of major colocation data centers. Much of Ireland's data center growth has been fueled by the efforts of IDA Ireland, an agency concerned with attracting inward foreign direct investment into the country.
  • The government is aligning twin transitions, which are both digital and green. While data centers currently account for just under 2% of all greenhouse gas emissions, they are responsible for about 14% of electricity usage in Ireland. The Irish government has set itself a target of having at least 70% of the country's energy derived from renewable sources by 2030.
  • Dublin has been Europe's fourth-largest recipient of ICT and internet infrastructure investments since 2010, with 21 projects, trailing London with 63 projects, Frankfurt with 58 projects, and Amsterdam with 52 projects. The majority of projects in this category are data center projects. In terms of projects, CyrusOne announced the breaking ground for its first data center campus in Dublin, Ireland. It is located in Grange Castle Business Park South, and the first phase of the advanced facility was ready for occupation in Q4 2020. On completion, the site will have a total power of 74 MW and is already responding to customer requests for space. Overall, the development of data center facilities is still an ongoing trend and is expected to continue to have a majority of IT load during the forecast period.
Ireland Data Center Construction Market, CAGR %, By Hotspot, 2023-2029

Ireland Data Center Construction Industry Overview

The Ireland data center construction market is consolidated, with significant companies such as AECOM, Arup Group Limited, Legrand, Alfa Laval Ltd, and Callaghan Engineering.

Ireland Data Center Construction Market Leaders

  1. Arup Group Limited

  2. Alfa Laval Ltd

  3. AECOM

  4. Legrand

  5. Callaghan Engineering

*Disclaimer: Major Players sorted in no particular order

Ireland Data Center Construction Market Concentration
Need More Details on Market Players and Competitors?
Download PDF

Ireland Data Center Construction Market News

  • January 2022: The company announced its new construction development in North and South Dublin, which is expected to be operational in 2023 and 2024, respectively.
  • September 2019: CyrusOne announced breaking ground for its first data center campus in Dublin. Located in Grange Castle Business Park South, the first phase of the advanced facility was ready for occupation in Q4 2020. When complete, the site will have a total power of 74MW and is already responding to customer requests for space.

Ireland Data Center Construction Market Report - Table of Contents

1. INTRODUCTION

  • 1.1 Study Assumption & Market Definition
  • 1.2 Scope of the Study

2. Research Methodology

3. Executive Summary

4. Market Dynamics

  • 4.1 Market Overview
  • 4.2 Market Drivers
    • 4.2.1 5G Developments Fuelling Data Center Investments
    • 4.2.2 Growing Cloud Servce adoption
    • 4.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
  • 4.3 Market Restraints
    • 4.3.1 Security Challenges Impacting Growth of Data Centers
  • 4.4 Value Chain / Supply Chain Analysis
  • 4.5 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.5.1 Threat of New Entrants
    • 4.5.2 Bargaining Power of Buyers/Consumers
    • 4.5.3 Bargaining Power of Suppliers
    • 4.5.4 Threat of Substitute Products
    • 4.5.5 Intensity of Competitive Rivalry
  • 4.6 Assessment of COVID-19 Impact

5. Key Industry Statistics

  • 5.1 Planned/Under Construction IT Load Capacity
  • 5.2 Planned/Under Construction Raised Floor Space
  • 5.3 Planned/Under Construction Submarine Cable

6. MARKET SEGMENTATION

  • 6.1 Tier Type
    • 6.1.1 Tier 1 and 2
    • 6.1.2 Tier 3
    • 6.1.3 Tier 4
  • 6.2 Data Center Size
    • 6.2.1 Small
    • 6.2.2 Medium
    • 6.2.3 Large
    • 6.2.4 Mega
    • 6.2.5 Massive
  • 6.3 Infrastructure
    • 6.3.1 Cooling Infrastructure
    • 6.3.1.1 Air-based Cooling
    • 6.3.1.2 Liquid-based Cooling
    • 6.3.1.3 Evaporative Cooling
    • 6.3.2 Power Infrastructure
    • 6.3.2.1 UPS Systems
    • 6.3.2.2 Generators
    • 6.3.2.3 Power Distribution Unit (PDU)
    • 6.3.3 Racks and Cabinets
    • 6.3.4 Servers
    • 6.3.5 Networking Equipment
    • 6.3.6 Physical Security Infrastructure
    • 6.3.7 Design and Consulting Services
    • 6.3.8 Other Infrastructure
  • 6.4 End-User
    • 6.4.1 IT & Telecommunication
    • 6.4.2 BFSI
    • 6.4.3 Government
    • 6.4.4 Healthcare
    • 6.4.5 Other End User

7. COMPETITIVE LANDSCAPE

  • 7.1 Company Profiles*
    • 7.1.1 AECOM
    • 7.1.2 Arup Group Limited
    • 7.1.3 DPR CONSTRUCTION, INC.
    • 7.1.4 IBM Corporation
    • 7.1.5 Schneider Electric SE
    • 7.1.6 Kirby Group Engineering
    • 7.1.7 Coromatic AB Sweden
    • 7.1.8 Legrand SA
    • 7.1.9 Bouygues Construction
    • 7.1.10 ALFA LAVAL AB
    • 7.1.11 Per Aarsleff A/S
    • 7.1.12 Johnson Controls International PLC
    • 7.1.13 Callaghan Engineering
    • 7.1.14 Trane Technologies International Limited
    • 7.1.15 Coolair Equipment Ltd.

8. INVESTMENT ANALYSIS

9. MARKET OPPORTUNITIES AND FUTURE TRENDS

** Subject To Availablity
**Subject to Availability
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

Ireland Data Center Construction Industry Segmentation

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.

The Ireland data center construction market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), by power infrastructure (UPS systems, generators, power distribution unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and by end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.

Tier Type Tier 1 and 2
Tier 3
Tier 4
Data Center Size Small
Medium
Large
Mega
Massive
Infrastructure Cooling Infrastructure Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Infrastructure Power Infrastructure UPS Systems
Generators
Power Distribution Unit (PDU)
Infrastructure Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
End-User IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Need A Different Region Or Segment?
Customize Now

Ireland Data Center Construction Market Research Faqs

The Ireland Data Center Construction Market is projected to register a CAGR of 8% during the forecast period (2024-2029)

Arup Group Limited, Alfa Laval Ltd, AECOM, Legrand and Callaghan Engineering are the major companies operating in the Ireland Data Center Construction Market.

The report covers the Ireland Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022 and 2023. The report also forecasts the Ireland Data Center Construction Market size for years: 2024, 2025, 2026, 2027, 2028 and 2029.

Ireland Data Center Construction Industry Report

Statistics for the 2024 Ireland Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Ireland Data Center Construction analysis includes a market forecast outlook to for 2024 to (2024to2030 and historical overview. Get a sample of this industry analysis as a free report PDF download.

80% of our clients seek made-to-order reports. How do you want us to tailor yours?

Please enter a valid email id!

Please enter a valid message!

Ireland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)