Ireland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)

The Ireland Data Center Construction Market is Segmented by Tier Type (Tier 1 and 2, Tier 3, and Tier 4), by Data Center Size (Small, Medium, Large, Massive, and Mega), by Infrastructure (Cooling Infrastructure (Air-Based Cooling, Liquid-Based Cooling, Evaporative Cooling), Power Infrastructure (UPS Systems, Generators, Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, and Other Infrastructure), and End User ( IT & Telecommunication, BFSI, Government, Healthcare, and Other End User). The Market Sizes and Forecasts are Provided in Values of USD for all the Above Segments.

Ireland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)

Ireland Data Center Construction Industry Overview

The Ireland data center construction market is consolidated, with significant companies such as AECOM, Arup Group Limited, Legrand, Alfa Laval Ltd, and Callaghan Engineering.

Ireland Data Center Construction Market Leaders

  1. Arup Group Limited

  2. Alfa Laval Ltd

  3. AECOM

  4. Legrand

  5. Callaghan Engineering

  6. *Disclaimer: Major Players sorted in no particular order
Ireland Data Center Construction Market Concentration