Market Size of Ireland Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR (2024 - 2030) | 8.00 % |
Market Concentration | High |
Major Players*Disclaimer: Major Players sorted in no particular order |
Ireland Data Center Construction Market Analysis
The Ireland Data Center Construction Market is expected to register a CAGR of 8% during the forecast period.
- The upcoming IT load capacity of the Ireland data center construction market is expected to reach 1475.4 MW by 2029.
- The country's construction of raised floor area is expected to increase by 8.2 million sq. ft by 2029.
- The country's total number of racks to be installed is expected to reach 412121 units by 2029.
- There are close to 12 submarine cable systems connecting Ireland, and many are under construction. One such submarine cable, estimated to be built by the end of 2025, is Celtic Norse, which stretches over 2008 Kilometers with landing points in Killala, Ireland.
Ireland Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.
The Ireland data center construction market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), by power infrastructure (UPS systems, generators, power distribution unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and by end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.
Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
Data Center Size | |
Small | |
Medium | |
Large | |
Mega | |
Massive |
Infrastructure | |||||
| |||||
| |||||
Racks and Cabinets | |||||
Servers | |||||
Networking Equipment | |||||
Physical Security Infrastructure | |||||
Design and Consulting Services | |||||
Other Infrastructure |
End-User | |
IT & Telecommunication | |
BFSI | |
Government | |
Healthcare | |
Other End User |
Ireland Data Center Construction Market Size Summary
The Ireland data center construction market is experiencing significant growth, driven by the increasing adoption of cloud technologies and advancements in digital services. The market is characterized by a robust expansion in IT load capacity, raised floor area, and the number of racks, indicating a strong demand for data center infrastructure. Dublin, as the primary hub, benefits from its strategic location and favorable conditions for cooling servers, making it a focal point for colocation data centers. The government's initiatives, such as the EUR 85 million fund to support digital transformation, further bolster the market by encouraging businesses to enhance their digital capabilities. The presence of major players like Amazon Web Services and the ongoing development of submarine cable systems underscore the market's dynamic nature and its integration into global digital networks.
The market landscape is fairly consolidated, with key companies like AECOM, Arup Group Limited, and CyrusOne playing pivotal roles in the construction and expansion of data centers. The Irish government's commitment to aligning digital and green transitions is evident in its target to increase renewable energy usage, which is crucial for sustainable data center operations. Dublin's position as a leading recipient of ICT and internet infrastructure investments highlights its importance in the European market. The ongoing projects and investments in data center facilities reflect a continuous trend of growth, with significant contributions to the country's electricity usage and economic development.
Ireland Data Center Construction Market Size - Table of Contents
-
1. Market Dynamics
-
1.1 Market Overview
-
1.2 Market Drivers
-
1.2.1 5G Developments Fuelling Data Center Investments
-
1.2.2 Growing Cloud Servce adoption
-
1.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
-
-
1.3 Market Restraints
-
1.3.1 Security Challenges Impacting Growth of Data Centers
-
-
1.4 Value Chain / Supply Chain Analysis
-
1.5 Industry Attractiveness - Porter's Five Forces Analysis
-
1.5.1 Threat of New Entrants
-
1.5.2 Bargaining Power of Buyers/Consumers
-
1.5.3 Bargaining Power of Suppliers
-
1.5.4 Threat of Substitute Products
-
1.5.5 Intensity of Competitive Rivalry
-
-
1.6 Assessment of COVID-19 Impact
-
-
2. MARKET SEGMENTATION
-
2.1 Tier Type
-
2.1.1 Tier 1 and 2
-
2.1.2 Tier 3
-
2.1.3 Tier 4
-
-
2.2 Data Center Size
-
2.2.1 Small
-
2.2.2 Medium
-
2.2.3 Large
-
2.2.4 Mega
-
2.2.5 Massive
-
-
2.3 Infrastructure
-
2.3.1 Cooling Infrastructure
-
2.3.1.1 Air-based Cooling
-
2.3.1.2 Liquid-based Cooling
-
2.3.1.3 Evaporative Cooling
-
-
2.3.2 Power Infrastructure
-
2.3.2.1 UPS Systems
-
2.3.2.2 Generators
-
2.3.2.3 Power Distribution Unit (PDU)
-
-
2.3.3 Racks and Cabinets
-
2.3.4 Servers
-
2.3.5 Networking Equipment
-
2.3.6 Physical Security Infrastructure
-
2.3.7 Design and Consulting Services
-
2.3.8 Other Infrastructure
-
-
2.4 End-User
-
2.4.1 IT & Telecommunication
-
2.4.2 BFSI
-
2.4.3 Government
-
2.4.4 Healthcare
-
2.4.5 Other End User
-
-
Ireland Data Center Construction Market Size FAQs
What is the current Ireland Data Center Construction Market size?
The Ireland Data Center Construction Market is projected to register a CAGR of 8% during the forecast period (2024-2029)
Who are the key players in Ireland Data Center Construction Market?
Arup Group Limited, Alfa Laval Ltd, AECOM, Legrand and Callaghan Engineering are the major companies operating in the Ireland Data Center Construction Market.