Malaysia Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)

Malaysia Data Center Construction Market Report is Segmented by Infrastructure (Electrical Infrastructure (Power Distribution Solution (PDU, Transfer Switches, Switchgear, Power Panels and Components, Other Power Distribution Solutions)), Power Back-Up Solution (UPS, Generators), Service – Design & Consulting, Integration, Support & Maintenance)), (mechanical Infrastructure (Cooling Systems (Immersion Cooling, Direct-To-Chip Cooling, Rear Door Heat Exchanger, In-Row and In-Rack Cooling)), Racks, Other Mechanical Infrastructure), General Construction)), by Tier Type (Tier-I and -II, Tier-III, Tier-IV), and by End User (Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, and Other End Users). The Market Sizes and Forecasts are Provided in Value Terms (USD) for all the Above Segments.

Malaysia Data Center Construction Market Size

Malaysia Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Market Size (2024) USD 2.80 Billion
Market Size (2030) USD 6.60 Billion
CAGR (2024 - 2030) 15.03 %
Market Concentration Medium

Major Players

Malaysia Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Compare market size and growth of Malaysia Data Center Construction Market with other markets in Technology, Media and Telecom Industry

Automation

Digital Commerce

Electronics

Information Technology

Media and Entertainment

Security & Surveillance

Malaysia Data Center Construction Market Analysis

The Malaysia Data Center Construction Market size is estimated at USD 2.80 billion in 2024, and is expected to reach USD 6.60 billion by 2030, growing at a CAGR of 15.03% during the forecast period (2024-2030).

Factors such as the rising demand for cloud computing among SMEs, bolstered by government regulations emphasizing local data security and amplified investments by domestic players, are pivotal in propelling the demand for data centers in the Malaysian market.

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Malaysian data center construction market is expected to reach 1,460 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase to 5.2 million sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach 263,359 units by 2030. Cyberjaya-Kuala Lumpur is expected to house the maximum number of racks by 2030.
  • Planned Submarine Cables: There are close to 23 submarine cable systems connecting Malaysia, and many are under construction. One such submarine cable that is estimated to start service in 2025 is SeaMeWe-6, which stretches over 19,200 km with landing points from Morib, Malaysia.

Malaysia Data Center Construction Market Trends

IT and Telecom Segment Expected to Gain a Significant Market Share

  • Malaysia's telecom industry is currently navigating an extended negotiation phase between the government and key local operators. In a recent agreement, major carriers, including CelcomDigi, Maxis, U Mobile, Telekom Malaysia, and YTL Power International, committed to purchasing a 14% stake in DNB, each investing approximately USD 50 million.
  • The development of digital infrastructure, such as data centers, is central to enabling 5G applications. Owing to this, various investors are signing an agreement for the 5G launch. For instance, in June 2024, Malaysian operators implementing the dual-network 5G model announced that they were poised to finalize an agreement to acquire stakes in the state-operated 5G network, Digital Nasional Berhad (DNB).
  • Further, the government announced its plans for a second 5G network, emphasizing its focus on implementing 5G technology across various verticals.
  • Moreover, by April 2024, DNB's 5G network covered 81.5% of populated areas, with an adoption rate of 39.2%. The nation boasted a cumulative 13.2 million 5G subscriptions. These subscriptions were divided into 12.7 million for individual users and 422,609 for enterprises. The growing subscriptions are expected to increase dependency on data centers.
  • In terms of IT, Malaysia secured the eighth spot in the Asia-Pacific market, boasting a CRI score of 68.5. Specifically, in cloud regulation, Malaysia notched a score of 24.9, ranking it 8th in the regional market. Leading provider Amazon Web Services (AWS) recently inked a fresh Cloud Framework Agreement (CFA) with the Malaysian government. This collaboration, alongside local IT provider Radmik Solutions Sdn Bhd, aims to expedite cloud adoption within the public sector. The initiative targets cost savings, enhanced digital skills, and a push for innovation across government agencies. Such instances in the market are expected to create more opportunities for data center construction players in the coming years.
Malaysia Data Center Construction Market: Number of 5G mobile broadband subscriptions, Malaysia, Q2 2022-Q4 2023

Tier-III Segment Expected to Hold a Major Share in the Malaysian Market

  • Tier-III data centers are majorly popular in Malaysia, with their capacity projected to reach 575 MW in 2024. The segment is estimated to reach an IT load capacity of 1,186 MW by 2029 while recording a CAGR of 12.8%.
  • In 2023, there were around 45 data centers in Malaysia with tier-III certification and a cumulative IT load capacity of around 432 MW. Reliability and affordability are the major factors driving the country's demand for tier-III data centers.
  • Cyberjaya hosts the maximum number of tier-III data centers in the country, with a share of 70.6%, followed by Kuala Lumpur, Johor Bahru, and George Town. In 2023, VADS BERHAD (TM One) had 10 data centers with tier-III certification in Malaysia, followed by Open DC Sdn Bhd and NTT Ltd, with four data center facilities each.
  • More than 10 data center facilities are currently under construction in Malaysia and are being built in accordance with tier-III standards. Major players involved in tier-III DC construction include Bridge Data Center (Chindata Group), Basis Bay, YTL Data Center Holdings Pte Ltd (YTL Power International Berhad), Regal Orion Sdn Bhd, and NTT Ltd. The constructions are projected to be more concentrated in Cyberjaya-Kuala Lumpur, Johor Bahru, and George Town.
  • In July 2024, Princeton Digital Group (PDG), an APAC data center company, completed the initial phase of its Johor campus in Malaysia, boasting an IT load capacity of 52 MW. Such developments are poised to fuel market growth through the forecast period.
Malaysia Data Center Construction Market: Malaysia Data Center Market, Expected IT Load Capacity, By Tier-3 Type, 2022-2024

Malaysia Data Center Construction Industry Overview

The Malaysian data center construction market is semi-consolidated, with a few major players, such as Aurecon Group Pty Ltd, AECOM, DSCO Group Pte Ltd, Turner & Townsend, and Jacobs Engineering Group.

  • In April 2024, Asia-Pacific Strategic Investments Limited (APS), a Singaporean real estate firm, acquired a data center company with intentions to expand its operations into Malaysia. APS, known for its expertise in constructing hospitality establishments and retirement communities, marked its inaugural foray into the data center industry with this acquisition.
  • In July 2023, Singtel announced plans to develop a data center in Johor, Malaysia, during discussions with the company on a state visit by the head of the Singaporean government. This is expected to create opportunities for the vendors in the market.

Malaysia Data Center Construction Market Leaders

  1. Aurecon Group Pty Ltd.

  2. AECOM

  3. DSCO Group Pte Ltd.

  4. Turner & Townsend

  5. Jacobs Engineering Group

*Disclaimer: Major Players sorted in no particular order

Malaysia Data Center Construction Market Concentration
Need More Details on Market Players and Competitors?
Download PDF

Malaysia Data Center Construction Market News

  • May 2024: Bridge DC announced a strategic partnership with Malaysia's Mah Sing. The collaboration aims to establish a 100MW campus located just outside Kuala Lumpur. Notably, Bridge DC will be the inaugural tenant in Mah Sing's upcoming data center park, situated in Southville City.
  • November 2023: ST Telemedia Global Data Centres (STT GDC) formed a joint venture (JV) with Basis Bay, a provider of green data centers. The collaboration aims to develop and operate data centers in Kuala Lumpur and Cyberjaya, Malaysia.

Malaysia Data Center Construction Market Report - Table of Contents

1. INTRODUCTION

  • 1.1 Study Assumptions and Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  • 2.1 Research Framework
  • 2.2 Secondary Research
  • 2.3 Primary Research
  • 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

  • 4.1 Market Overview
  • 4.2 Market Dynamics
    • 4.2.1 Market Drivers
    • 4.2.1.1 The Rapid Adoption of Cloud Computing by Enterprise and Government Drives Demand in the Market
    • 4.2.1.2 Government Initiatives to Modernize in the Digital Era Fueling Heightened Demand for Data Centers Nationwide
    • 4.2.2 Market Restraints
    • 4.2.2.1 High Power Consumption can Deter Investments
  • 4.3 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.3.1 Bargaining Power of Suppliers
    • 4.3.2 Bargaining Power of Consumers
    • 4.3.3 Threat of New Entrants
    • 4.3.4 Threat of Substitutes
    • 4.3.5 Intensity of Competitive Rivalry
  • 4.4 Key Malaysia Data Center Construction Statistics
    • 4.4.1 Number of Data Centers In Malaysia, 2022 and 2023
    • 4.4.2 Data Centers Under Construction in Malaysia, in MW, 2024 - 2029
    • 4.4.3 Average Capex and Opex for the Malaysian Data Center Construction Market
    • 4.4.4 Data Center Power Capacity Absorption in MW, Selected Cities, Malaysia, 2022 and 2023
    • 4.4.5 Top Capex Spenders on Data Center Infrastructure in Malaysia

5. MARKET SEGMENTATION

  • 5.1 Market Segmentation - By Infrastructure
    • 5.1.1 Market Segmentation - By Electrical Infrastructure
    • 5.1.1.1 Power Distribution Solution
    • 5.1.1.1.1 PDU - Basic & Smart - Metered & Switched Solutions
    • 5.1.1.1.2 Transfer Switches
    • 5.1.1.1.2.1 Static
    • 5.1.1.1.2.2 Automatic (ATS)
    • 5.1.1.1.3 Switchgear
    • 5.1.1.1.3.1 Low-voltage
    • 5.1.1.1.3.2 Medium-voltage
    • 5.1.1.1.4 Power Panels and Components
    • 5.1.1.1.5 Other Power Distribution Solutions
    • 5.1.1.2 Power Back Up Solutions
    • 5.1.1.2.1 UPS
    • 5.1.1.2.2 Generators
    • 5.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance
    • 5.1.2 Market Segmentation - By Mechanical Infrastructure
    • 5.1.2.1 Cooling Systems
    • 5.1.2.1.1 Immersion Cooling
    • 5.1.2.1.2 Direct-to-Chip Cooling
    • 5.1.2.1.3 Rear Door Heat Exchanger
    • 5.1.2.1.4 In-row and In-rack Cooling
    • 5.1.2.2 Racks
    • 5.1.2.3 Other Mechanical Infrastructure
    • 5.1.3 General Construction
  • 5.2 Market Segmentation - By Tier Type
    • 5.2.1 Tier-I and-II
    • 5.2.2 Tier-III
    • 5.2.3 Tier-IV
  • 5.3 Market Segmentation - By End User
    • 5.3.1 Banking, Financial Services, and Insurance
    • 5.3.2 IT and Telecommunications
    • 5.3.3 Government and Defense
    • 5.3.4 Healthcare
    • 5.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

  • 6.1 Company Profiles
    • 6.1.1 Aurecon Group Pty Ltd
    • 6.1.2 AECOM
    • 6.1.3 DSCO Group Pte Ltd
    • 6.1.4 Turner & Townsend
    • 6.1.5 Jacobs Engineering Group
    • 6.1.6 Gaw Capital Partners
    • 6.1.7 JLand Group (JLG)
    • 6.1.8 Cyclect Group
    • 6.1.9 Basis Bay
    • 6.1.10 Mah Sing Group Bhd
  • *List Not Exhaustive

7. INVESTMENTS ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

  • 9.1 Industries Covered
  • 9.2 Illustrative List of Clients in the Industry
  • 9.3 Our Customized Research Capabilities
** Subject To Availablity
**Subject to Availability
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

Malaysia Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with the requirements of data center operational environments.

The Malaysian data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solution (PDU, transfer switches, switchgear, power panels and components, other power distribution solutions)), power back-up solution (UPS, generators), service – design & consulting, integration, support & maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, in-row and in-rack cooling)), racks, other mechanical infrastructure)), general construction)), by tier type (tier-I and -II, tier-III, and tier-IV), and by end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users). The market sizes and forecasts are provided in value (USD) for all the abovementioned segments.

Market Segmentation - By Infrastructure Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic & Smart - Metered & Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Distribution Solutions
Market Segmentation - By Infrastructure Market Segmentation - By Electrical Infrastructure Power Back Up Solutions UPS
Generators
Market Segmentation - By Infrastructure Market Segmentation - By Electrical Infrastructure Service - Design & Consulting, Integration, Support & Maintenance
Market Segmentation - By Infrastructure Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Market Segmentation - By Infrastructure Market Segmentation - By Mechanical Infrastructure Racks
Other Mechanical Infrastructure
Market Segmentation - By Infrastructure General Construction
Market Segmentation - By Tier Type Tier-I and-II
Tier-III
Tier-IV
Market Segmentation - By End User Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

Malaysia Data Center Construction Market Research FAQs

The Malaysia Data Center Construction Market size is expected to reach USD 2.80 billion in 2024 and grow at a CAGR of 15.03% to reach USD 6.60 billion by 2030.

In 2024, the Malaysia Data Center Construction Market size is expected to reach USD 2.80 billion.

Aurecon Group Pty Ltd., AECOM, DSCO Group Pte Ltd., Turner & Townsend and Jacobs Engineering Group are the major companies operating in the Malaysia Data Center Construction Market.

In 2023, the Malaysia Data Center Construction Market size was estimated at USD 2.38 billion. The report covers the Malaysia Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022 and 2023. The report also forecasts the Malaysia Data Center Construction Market size for years: 2024, 2025, 2026, 2027, 2028, 2029 and 2030.

Malaysia Data Center Construction Industry Report

Statistics for the 2024 Malaysia Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Malaysia Data Center Construction analysis includes a market forecast outlook to for 2024 to (2024to2030 and historical overview. Get a sample of this industry analysis as a free report PDF download.

80% of our clients seek made-to-order reports. How do you want us to tailor yours?

Please enter a valid email id!

Please enter a valid message!

Malaysia Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)