Philippines Data Center Construction Market Size (2024 - 2029)

The Philippines Data Center Construction Market is projected to experience significant growth over the forecast period, with its market size expanding considerably. This growth is driven by the development of IT load capacity, raised floor space, and the installation of racks, particularly concentrated in the National Capital Region. Additionally, the construction of submarine cable systems, such as the Asia Link Cable, is set to enhance connectivity, further contributing to the market's expansion.

Market Size of Philippines Data Center Construction Industry

Philippines Data Center Construction Market Summary
Study Period 2019 - 2030
Base Year For Estimation 2023
Market Size (2024) USD 1.9 Billion
Market Size (2030) USD 4.5 Billion
CAGR (2024 - 2030) 14.85 %
Market Concentration Medium

Major Players

Philippines Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Philippines Data Center Construction Market Analysis

The Philippines Data Center Construction Market size is estimated at USD 1.9 billion in 2024, and is expected to reach USD 4.5 billion by 2030, growing at a CAGR of 14.85% during the forecast period (2024-2030).

Investments in data centers in the Philippines are being propelled by the rise of 5G, increased adoption of renewable energy, and enhanced digitalization, especially with the deployment of submarine cables and fiber connectivity.

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Philippine data center construction market is expected to reach 1,014 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 3.6 million sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach 181,000 units by 2030.
  • Planned Submarine Cables: There are close to 11 submarine cable systems connecting the Philippines, and many are under construction. One such submarine cable that is estimated to start service in 2025 is Asia Link Cable (ALC), which stretches over 6,000 km with landing points from Bauang to the Philippines.

Philippines Data Center Construction Industry Segmentation

Data center construction combines the physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Philippine data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solutions (PDU, transfer switches, switchgear, power panels and components, and other power distribution solutions), power back-up solutions (UPS and generators), and service – design and consulting, integration, support and maintenance), mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure), and general construction), tier type (tier I and II, tier III, and tier IV), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

Market Segmentation - by Infrastructure
Market Segmentation - by Electrical Infrastructure
Power Distribution Solution
PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches
Static
Automatic (ATS)
Switchgear
Low-voltage
Medium-voltage
Power Panels and Components
Other Power Distribution Solutions
Power Back-up Solutions
UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
Market Segmentation - By Mechanical Infrastructure
Cooling Systems
Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Tier I and II
Tier III
Tier IV
Market Segmentation - By End User
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Need A Different Region Or Segment?
Customize Now

Philippines Data Center Construction Market Size Summary

The Philippines Data Center Construction Market is poised for significant growth, driven by the increasing digital adoption and the expansion of telecom infrastructure. The market is characterized by a robust investment landscape, with major players like Alibaba Cloud Intelligence and PLDT Group actively expanding their data center capacities to meet the rising demand for cloud-based solutions and digital services. The government's initiatives, such as the National Broadband Plan and the Common Tower Policy, are further enhancing the telecom infrastructure, facilitating the growth of data centers. The proliferation of 5G networks and the surge in online activities, including streaming, gaming, and e-commerce, are contributing to the heightened demand for data center facilities across the country.

The market is witnessing a consolidation of key players, including Dataone, Vertiv, and Schneider Electric Philippines, who are actively involved in expanding and upgrading data center capacities. Notable developments include ST Telemedia Global Data Centers' expansion plans in Makati, Cavite, and Quezon City, and Zenlayer's joint venture with Megaport to enhance network connectivity. These strategic moves are expected to create ample opportunities for vendors and stakeholders in the market. The increasing reliance on data centers is further underscored by the growing use of smartphones and digital platforms, which have become integral to the daily lives of Filipinos, thereby driving the demand for advanced data center infrastructure.

Explore More

Philippines Data Center Construction Market Size - Table of Contents

  1. 1. MARKET SEGMENTATION

    1. 1.1 Market Segmentation - by Infrastructure

      1. 1.1.1 Market Segmentation - by Electrical Infrastructure

        1. 1.1.1.1 Power Distribution Solution

          1. 1.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions

          2. 1.1.1.1.2 Transfer Switches

            1. 1.1.1.1.2.1 Static

            2. 1.1.1.1.2.2 Automatic (ATS)

          3. 1.1.1.1.3 Switchgear

            1. 1.1.1.1.3.1 Low-voltage

            2. 1.1.1.1.3.2 Medium-voltage

          4. 1.1.1.1.4 Power Panels and Components

          5. 1.1.1.1.5 Other Power Distribution Solutions

        2. 1.1.1.2 Power Back-up Solutions

          1. 1.1.1.2.1 UPS

          2. 1.1.1.2.2 Generators

        3. 1.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance

      2. 1.1.2 Market Segmentation - By Mechanical Infrastructure

        1. 1.1.2.1 Cooling Systems

          1. 1.1.2.1.1 Immersion Cooling

          2. 1.1.2.1.2 Direct-to-Chip Cooling

          3. 1.1.2.1.3 Rear Door Heat Exchanger

          4. 1.1.2.1.4 In-row and In-rack Cooling

        2. 1.1.2.2 Racks

        3. 1.1.2.3 Other Mechanical Infrastructure

      3. 1.1.3 General Construction

    2. 1.2 Market Segmentation - By Tier Type

      1. 1.2.1 Tier I and II

      2. 1.2.2 Tier III

      3. 1.2.3 Tier IV

    3. 1.3 Market Segmentation - By End User

      1. 1.3.1 Banking, Financial Services, and Insurance

      2. 1.3.2 IT and Telecommunications

      3. 1.3.3 Government and Defense

      4. 1.3.4 Healthcare

      5. 1.3.5 Other End Users

Philippines Data Center Construction Market Size FAQs

The Philippines Data Center Construction Market size is expected to reach USD 1.9 billion in 2024 and grow at a CAGR of 14.85% to reach USD 4.5 billion by 2030.

In 2024, the Philippines Data Center Construction Market size is expected to reach USD 1.9 billion.

Philippines Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024 - 2030)