Market Size of Poland Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR (2024 - 2030) | 15.10 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Poland Data Center Construction Market Analysis
The Poland Data Center Construction Market is expected to register a CAGR of 15.10% during the forecast period.
The Poland data center construction market is projected to register a CAGR of 15.10%.
- The upcoming IT load capacity of the Poland data center construction market is expected to reach 561 MW by 2029.
- The country's construction of raised floor area is expected to increase by 3.7 million sq. ft by 2029.
- The country's total number of racks to be installed is expected to reach 187,016 units by 2029. Warsaw is expected to house the maximum number of racks by 2029.
- There are close to 2 submarine cable systems connecting Poland. One such submarine cable was built in 1997. The cable is called Baltica, which stretches over 437 Kilometers with landing points in Mielno, Poland
Poland Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.
poland data center construction market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), power infrastructure (ups systems, generators, power distribution unit (pdu), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and end user ( it & telecommunication, bfsi, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments
Tier Type | |
Tier 1 and 2 | |
Tier 3 | |
Tier 4 |
Data Center Size | |
Small | |
Medium | |
Large | |
Mega | |
Massive |
Infrastructure | |||||
| |||||
| |||||
Racks and Cabinets | |||||
Servers | |||||
Networking Equipment | |||||
Physical Security Infrastructure | |||||
Design and Consulting Services | |||||
Other Infrastructure |
End-User | |
IT & Telecommunication | |
BFSI | |
Government | |
Healthcare | |
Other End User |
Poland Data Center Construction Market Size Summary
The Poland data center construction market is experiencing significant growth, driven by increasing demand across various sectors such as media and entertainment, manufacturing, BFSI, e-commerce, and government services. The rise in digital services and e-government initiatives is expected to further boost demand, particularly in Warsaw, which is the primary hub for data center activities in the country. The city's strategic initiatives, like the Digital Transformation Policy, aim to enhance technological infrastructure and digital services, thereby stimulating the need for advanced data processing and storage facilities. The market is also witnessing expansion in other cities like Krakow and Wroclaw, which offer cost-effective commercial land and a skilled workforce, contributing to the overall growth of the data center market in Poland.
The market is moderately consolidated, with key players such as Turner & Townsend, STULZ, AECOM, Legrand, and Arup actively participating in the development of data center infrastructure. Recent developments include Atman's acquisition of land for a new data center and the expansion of its existing facilities, indicating ongoing investment in the sector. The increasing value of non-cash transactions and the growing inclination towards cloud services underscore the rising data consumption, further propelling the demand for data centers. As the market continues to evolve, the focus on cloud and telecom services is expected to dominate, with significant contributions to the market share during the forecast period.
Poland Data Center Construction Market Size - Table of Contents
-
1. Market Dynamics
-
1.1 Market Overview
-
1.2 Market Drivers
-
1.2.1 5G Developments Fuelling Data Center Investments
-
1.2.2 Growing Cloud Servce adoption
-
1.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
-
-
1.3 Market Restraints
-
1.3.1 Security Challenges Impacting Growth of Data Centers
-
-
1.4 Value Chain / Supply Chain Analysis
-
1.5 Industry Attractiveness - Porter's Five Forces Analysis
-
1.5.1 Threat of New Entrants
-
1.5.2 Bargaining Power of Buyers/Consumers
-
1.5.3 Bargaining Power of Suppliers
-
1.5.4 Threat of Substitute Products
-
1.5.5 Intensity of Competitive Rivalry
-
-
1.6 Assessment of COVID-19 Impact
-
-
2. MARKET SEGMENTATION
-
2.1 Tier Type
-
2.1.1 Tier 1 and 2
-
2.1.2 Tier 3
-
2.1.3 Tier 4
-
-
2.2 Data Center Size
-
2.2.1 Small
-
2.2.2 Medium
-
2.2.3 Large
-
2.2.4 Mega
-
2.2.5 Massive
-
-
2.3 Infrastructure
-
2.3.1 Cooling Infrastructure
-
2.3.1.1 Air-based Cooling
-
2.3.1.2 Liquid-based Cooling
-
2.3.1.3 Evaporative Cooling
-
-
2.3.2 Power Infrastructure
-
2.3.2.1 UPS Systems
-
2.3.2.2 Generators
-
2.3.2.3 Power Distribution Unit (PDU)
-
-
2.3.3 Racks and Cabinets
-
2.3.4 Servers
-
2.3.5 Networking Equipment
-
2.3.6 Physical Security Infrastructure
-
2.3.7 Design and Consulting Services
-
2.3.8 Other Infrastructure
-
-
2.4 End-User
-
2.4.1 IT & Telecommunication
-
2.4.2 BFSI
-
2.4.3 Government
-
2.4.4 Healthcare
-
2.4.5 Other End User
-
-
Poland Data Center Construction Market Size FAQs
What is the current Poland Data Center Construction Market size?
The Poland Data Center Construction Market is projected to register a CAGR of 15.10% during the forecast period (2024-2029)
Who are the key players in Poland Data Center Construction Market?
AECOM, Arup, Legrand, Turner & Townsend and STULZ are the major companies operating in the Poland Data Center Construction Market.