Singapore Data Center Construction Market Size (2024 - 2029)

The Singapore data center construction market is experiencing growth driven by the expanding internet economy and the rapid adoption of cloud-based operations, which necessitate increased data management capacities. Singapore's advantageous position in the Asia-Pacific region is bolstered by its robust network infrastructure, pro-business climate, and strategic government incentives, such as Free Trade Zones. Despite challenges related to environmental impact, construction costs, and workforce issues, the market is poised for expansion, particularly as demand for data capacity surges post-pandemic. The shift towards hybrid cloud environments further stimulates the market, leading to increased construction activities, including multi-story developments in space-constrained areas.

Market Size of Singapore Data Center Construction Industry

Singapore Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Forecast Data Period 2024 - 2029
Historical Data Period 2019 - 2022
CAGR (2024 - 2030) 3.04 %
Market Concentration Medium

Major Players

Singapore Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Singapore Data Center Construction Market Analysis

The Singapore Data Center Construction Market is expected to register a CAGR of 3.04% during the forecast period.

One of the critical sources of growth in the region is its increasing internet economy. The rapid adoption of cloud-based business operations has encouraged businesses to acquire data management capacities to handle vast volumes of data that are being generated. Increased proliferation of online shopping due to the availability of user-friendly interfaces, high-speed internet, and smart devices such as smartphones, tablets, laptops, etc., is expected to drive the market in the future.

  • Singapore holds a significant share of the Asia-Pacific data center market owing to its strong network infrastructure, pro-business environment, economic and political stability, low corporate tax rate, and low risk of natural disasters relative to other countries. Many data center operators, such as SpaceDC, have been building green data centers to support sustainability requirements. Space DC is based in Jakarta over a 1.8-hectare campus to house two data centers. In order to power the facility, the company uses natural gas to produce electricity and is focused on local natural resources in order to create green energy and reduce its carbon footprint.
  • Moreover, the government of Singapore offers free Trade Zones or economic areas that provide firms with beneficial customs and tax incentives. Some of the Free Trade Zones present in Singapore include Tanjong Pagar Terminal and Keppel Terminal, Sembawang Wharves, and more. Such initiatives are driving opportunities for more construction in the country.
  • Further, many of the larger deals have also brought more multi-story construction, particularly in property-constrained markets. Building vertically allows developers to maximize the square footage on each acre of property. The most prominent example is Facebook's 1.8 million SF project in Singapore, which features an 11-story purpose-built data center structure. Such investment activities and the growth trends of the real estate and construction sector across the country are expected to stimulate the growth of data center construction over the forecast period.
  • Environmental, cost and workforce-related challenges could restrain the Singapore data center construction market. The environmental impacts are wide-reaching, impacting climate change, pollution, biodiversity, and natural resources. Though the challenges are broad, they present many opportunities for improvement and long-lasting positive impact. The cost of constructing the data center is also high, which could restrain small and medium enterprises from setting up a new center. The vendor's focus is on the regions that have lower costs for construction.

Singapore Data Center Construction Industry Segmentation

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The singapore data center construction market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), power infrastructure (ups systems, generators, power distribution unit (pdu), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and end user ( it & telecommunication, bfsi, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.

Tier Type
Tier 1 and 2
Tier 3
Tier 4
Data Center Size
Small
Medium
Large
Mega
Massive
Infrastructure
Cooling Infrastructure
Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Power Infrastructure
UPS Systems
Generators
Power Distribution Unit (PDU)
Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
End-User
IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Need A Different Region Or Segment?
Customize Now

Singapore Data Center Construction Market Size Summary

The Singapore data center construction market is experiencing steady growth, driven by the expanding internet economy and the rapid adoption of cloud-based business operations. This growth is supported by Singapore's robust network infrastructure, favorable business environment, and strategic government initiatives such as Free Trade Zones, which offer tax and customs incentives. The market is also witnessing a shift towards sustainability, with operators like SpaceDC focusing on green data centers to reduce carbon footprints. The demand for data center capacity has surged post-pandemic, as companies increasingly adopt hybrid cloud environments, further stimulating construction activities in the region. The market is characterized by significant investments from major players, including hyperscale cloud providers like Google and Alibaba, which are enhancing the country's digital infrastructure.

The market is moderately consolidated, with key players such as Fortis Construction, ABB Ltd, and AECOM dominating the landscape. The tier 3 and 4 segments are expected to hold substantial market shares, with tier 4 facilities gaining traction due to their potential for efficient energy use and modern infrastructure. Despite challenges related to environmental impact and high construction costs, the market is poised for growth, supported by ongoing investments and technological advancements. Initiatives like the development of new data centers by Equinix, GDS, and Microsoft, along with partnerships exploring innovative energy solutions, are expected to drive further opportunities for vendors in the market.

Explore More

Singapore Data Center Construction Market Size - Table of Contents

  1. 1. Market Dynamics

    1. 1.1 Market Overview

    2. 1.2 Market Drivers

      1. 1.2.1 Increased Migration to Cloud-based Business Operations

      2. 1.2.2 Rise of Green Data Centers

      3. 1.2.3 Government Support in the Form of Tax Incentives for Development of Data Centers

    3. 1.3 Market Restraints

      1. 1.3.1 Higher Initial Investments and Low Availability of Resources

    4. 1.4 Value Chain / Supply Chain Analysis

    5. 1.5 Industry Attractiveness - Porter's Five Forces Analysis

      1. 1.5.1 Threat of New Entrants

      2. 1.5.2 Bargaining Power of Buyers/Consumers

      3. 1.5.3 Bargaining Power of Suppliers

      4. 1.5.4 Threat of Substitute Products

      5. 1.5.5 Intensity of Competitive Rivalry

    6. 1.6 Assessment of COVID-19 Impact

  2. 2. MARKET SEGMENTATION

    1. 2.1 Tier Type

      1. 2.1.1 Tier 1 and 2

      2. 2.1.2 Tier 3

      3. 2.1.3 Tier 4

    2. 2.2 Data Center Size

      1. 2.2.1 Small

      2. 2.2.2 Medium

      3. 2.2.3 Large

      4. 2.2.4 Mega

      5. 2.2.5 Massive

    3. 2.3 Infrastructure

      1. 2.3.1 Cooling Infrastructure

        1. 2.3.1.1 Air-based Cooling

        2. 2.3.1.2 Liquid-based Cooling

        3. 2.3.1.3 Evaporative Cooling

      2. 2.3.2 Power Infrastructure

        1. 2.3.2.1 UPS Systems

        2. 2.3.2.2 Generators

        3. 2.3.2.3 Power Distribution Unit (PDU)

      3. 2.3.3 Racks and Cabinets

      4. 2.3.4 Servers

      5. 2.3.5 Networking Equipment

      6. 2.3.6 Physical Security Infrastructure

      7. 2.3.7 Design and Consulting Services

      8. 2.3.8 Other Infrastructure

    4. 2.4 End-User

      1. 2.4.1 IT & Telecommunication

      2. 2.4.2 BFSI

      3. 2.4.3 Government

      4. 2.4.4 Healthcare

      5. 2.4.5 Other End User

Singapore Data Center Construction Market Size FAQs

The Singapore Data Center Construction Market is projected to register a CAGR of 3.04% during the forecast period (2024-2029)

Fortis Construction, ABB Ltd, Precomp Singapore, AECOM and TNS Asia Pacific PTE Ltd are the major companies operating in the Singapore Data Center Construction Market.

Singapore Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024 - 2030)