Switzerland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)

The Switzerland Data Center Construction Market is Segmented by Tier Type (Tier 1 and 2, Tier 3, and Tier 4), by Data Center Size (Small, Medium, Large, Massive, and Mega), by Infrastructure (Cooling Infrastructure (Air-Based Cooling, Liquid-Based Cooling, Evaporative Cooling), Power Infrastructure (UPS Systems, Generators, Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, and Other Infrastructure), and End User ( IT & Telecommunication, BFSI, Government, Healthcare, and Other End User). The Market Sizes and Forecasts are Provided in Values of USD for all the Above Segments.

Switzerland Data Center Construction Market Size

Switzerland Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Forecast Data Period 2024 - 2029
Historical Data Period 2019 - 2022
CAGR (2024 - 2030) 5.35 %
Market Concentration Medium

Major Players

Switzerland Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Compare market size and growth of Switzerland Data Center Construction Market with other markets in Technology, Media and Telecom Industry

Automation

Digital Commerce

Electronics

Information Technology

Media and Entertainment

Security & Surveillance

Switzerland Data Center Construction Market Analysis

The Switzerland Data Center Construction Market is expected to register a CAGR of 5.35% during the forecast period.

  • The upcoming IT load capacity of the Switzerland data center construction market is expected to reach 676.2 MW by 2029.
  • The country's construction of raised floor area is expected to increase by 2.6 million sq. ft by 2029.
  • The country's total number of racks to be installed is expected to reach 130,041 units by 2029. Zurich is expected to house the maximum number of racks by 2029.
  • In 2022, there were 93 colocation data center facilities in Russia. Moscow is the major hotspot, followed by St. Petersburg and others in the country. Some factors contributing to the growth of the data center in the country include cloud adoption, an increase in broadband connectivity, smartphone penetration, and growing digitization.

Switzerland Data Center Construction Market Trends

IT and Telecom to have significant market share

  • The cloud segment registered an IT load capacity of 70.93 MW in 2022. It is projected to exhibit a CAGR of 7.19% and surpass a capacity of 117.96 MW by 2029. On the other hand, the e-commerce and BFSI industries are estimated to record CAGRs of 7.17% and 7.21% to reach capacities of 89.07 MW and 82.45 MW, respectively, by 2029.
  • Among end-user industries, cloud (19.6%) and e-commerce (14.80%) are expected to hold the highest market share, while the banking, financial services, and insurance (BFSI) (13.7%) and manufacturing (11.6%) industries are expected to witness the fastest growth over the forecast period.
  • The Swiss data center market has also been driven by growing cloud use across companies because of their increasing integration of emerging technologies like artificial intelligence, big data, and blockchain. Cloud computing (anything-as-a-service (XaaS)) continues to be one of the most important trends in the Swiss IT industry. However, while most cloud solutions are still deployed in-house (besides traditional outsourcing and managed services), software-as-a-service (SaaS), in particular, is becoming increasingly important as a procurement model.
  • In 2019, private clouds were most commonly used (63%), and public and hybrid clouds were on par with shares of 28% each. However, hybrid scenarios continue to gain popularity as companies seek to offer an IT services mix customized as per individual preferences. Considering the above developments, the cloud data center segment is expected to account for a majority of capacity in the Swiss data center market by 2029.
Switzerland Data Center Construction Market, CAGR %, 2023-2029, By End User

Zurich to host many data center construction in the country

  • The total IT load capacity in the Zurich hotspot reached 270.1 MW in 2022 and is further projected to exhibit a CAGR of 5.39%, surpassing 399.1 MW by 2029. On the other hand, the rest of Switzerland is predicted to register a CAGR of 5.29% to reach a capacity of 277.16 MW by 2029.
  • Zurich is a significant financial hub in Europe. The banking industry produces about a third of the city's wealth and a quarter of its jobs. The Zurich economy is heavily based on various creative small and large firms and sectors.
  • Zurich is an ideal place to locate for fintech, energy and environment, and food tech startups. Zurich has 117 fintech startups, 53 energy and environment startups, and 47 food tech startups. Thus, the increasing number of startups is expected to complement the data center market in the region.
  • Geneva, Baar, Bern, Gland, Luzern, Lausanne, and others in the Rest of Switzerland region are expanding. Geneva is the second-largest city in terms of population in Switzerland. In 2021, Geneva was ranked as the world's ninth most important financial center for competitiveness by the Global Financial Centres Index, fifth in Europe behind London, Zurich, Frankfurt, and Luxembourg. Geneva 4G network availability increased from 88.4% in 2019 to 91.6% in 2021, and Bern 4G availability reached 93.6% with an average download speed of 64.3 Mbps. Thus, cities other than Zurich may see an increase in the construction of data centers in the years to come.
Switzerland Data Center Construction Market, CAGR %, 2023-2029, By Hotspot

Switzerland Data Center Construction Industry Overview

The Switzerland data center construction market is moderately consolidated, with significant companies such as Arup, DPR Construction, Legrand, KOHLER-SDMO, and AECOM.

In January 2023, a new data center facility opened in Zurich's Dielsdorf neighborhood owing to Swiss data center operator Green. On a 46,000 sqm (495,150 sq ft) site, the Zurich Metro campus will eventually consist of three buildings (M, N, and O).

Switzerland Data Center Construction Market Leaders

  1. Arup

  2. DPR Construction

  3. Legrand

  4. KOHLER-SDMO

  5. AECOM

*Disclaimer: Major Players sorted in no particular order

Switzerland Data Center Construction Market Concentration
Need More Details on Market Players and Competitors?
Download PDF

Switzerland Data Center Construction Market News

  • September 2022: In Switzerland's Zurich, Equinix expanded the size of one of its data centers. An extra 850 square meters (9,150 square feet) of whitespace and more than 200 cabinets have been added to the colocation giant's ZH4 IBX.
  • June 2022: The second data center in Zurich was erected in the Beringen industrial district, on the site of a former tennis club, according to STACK Infrastructure ("STACK"), the digital infrastructure partner of the enterprises and a global developer and operator of data centers.

Switzerland Data Center Construction Market Report - Table of Contents

1. INTRODUCTION

  • 1.1 Study Assumption & Market Definition
  • 1.2 Scope of the Study

2. Research Methodology

3. Executive Summary

4. Market Dynamics

  • 4.1 Market Overview
  • 4.2 Market Drivers
    • 4.2.1 5G Developments Fuelling Data Center Investments
    • 4.2.2 Growing Cloud Servce adoption
    • 4.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
  • 4.3 Market Restraints
    • 4.3.1 Security Challenges Impacting Growth of Data Centers
  • 4.4 Value Chain / Supply Chain Analysis
  • 4.5 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.5.1 Threat of New Entrants
    • 4.5.2 Bargaining Power of Buyers/Consumers
    • 4.5.3 Bargaining Power of Suppliers
    • 4.5.4 Threat of Substitute Products
    • 4.5.5 Intensity of Competitive Rivalry
  • 4.6 Assessment of COVID-19 Impact

5. Key Industry Statistics

  • 5.1 Planned/Under Construction IT Load Capacity
  • 5.2 Planned/Under Construction Raised Floor Space
  • 5.3 Planned/Under Construction Submarine Cable

6. MARKET SEGMENTATION

  • 6.1 Tier Type
    • 6.1.1 Tier 1 and 2
    • 6.1.2 Tier 3
    • 6.1.3 Tier 4
  • 6.2 Data Center Size
    • 6.2.1 Small
    • 6.2.2 Medium
    • 6.2.3 Large
    • 6.2.4 Mega
    • 6.2.5 Massive
  • 6.3 Infrastructure
    • 6.3.1 Cooling Infrastructure
    • 6.3.1.1 Air-based Cooling
    • 6.3.1.2 Liquid-based Cooling
    • 6.3.1.3 Evaporative Cooling
    • 6.3.2 Power Infrastructure
    • 6.3.2.1 UPS Systems
    • 6.3.2.2 Generators
    • 6.3.2.3 Power Distribution Unit (PDU)
    • 6.3.3 Racks and Cabinets
    • 6.3.4 Servers
    • 6.3.5 Networking Equipment
    • 6.3.6 Physical Security Infrastructure
    • 6.3.7 Design and Consulting Services
    • 6.3.8 Other Infrastructure
  • 6.4 End-User
    • 6.4.1 IT & Telecommunication
    • 6.4.2 BFSI
    • 6.4.3 Government
    • 6.4.4 Healthcare
    • 6.4.5 Other End User

7. COMPETITIVE LANDSCAPE

  • 7.1 Company Profiles
    • 7.1.1 AECOM
    • 7.1.2 Arup Group Limited
    • 7.1.3 DPR CONSTRUCTION, INC.
    • 7.1.4 IBM Corporation
    • 7.1.5 Schneider Electric SE
    • 7.1.6 Kohler Co.
    • 7.1.7 Rolls-Royce Power Systems
    • 7.1.8 Legrand SA
    • 7.1.9 Datacentre UK
    • 7.1.10 Castrol Limited
    • 7.1.11 Honeywell International Inc.
    • 7.1.12 Johnson Controls International PLC
    • 7.1.13 Datadome Group
    • 7.1.14 ffbk Architekten AG
    • 7.1.15 Daikin Industries Ltd.
  • *List Not Exhaustive

8. INVESTMENT ANALYSIS

9. MARKET OPPORTUNITIES AND FUTURE TRENDS

** Subject To Availablity
**Subject to Availability
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

Switzerland Data Center Construction Industry Segmentation

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.

The Switzerland Data Center Construction Market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure [air-based cooling, liquid-based cooling, evaporative cooling], power infrastructure [UPS systems, generators, power distribution unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and by end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.

Tier Type Tier 1 and 2
Tier 3
Tier 4
Data Center Size Small
Medium
Large
Mega
Massive
Infrastructure Cooling Infrastructure Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Infrastructure Power Infrastructure UPS Systems
Generators
Power Distribution Unit (PDU)
Infrastructure Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
End-User IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Need A Different Region Or Segment?
Customize Now

Switzerland Data Center Construction Market Research Faqs

The Switzerland Data Center Construction Market is projected to register a CAGR of 5.35% during the forecast period (2024-2029)

Arup, DPR Construction, Legrand, KOHLER-SDMO and AECOM are the major companies operating in the Switzerland Data Center Construction Market.

The report covers the Switzerland Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022 and 2023. The report also forecasts the Switzerland Data Center Construction Market size for years: 2024, 2025, 2026, 2027, 2028 and 2029.

Switzerland Data Center Construction Industry Report

Statistics for the 2024 Switzerland Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Switzerland Data Center Construction analysis includes a market forecast outlook to for 2024 to (2024to2030 and historical overview. Get a sample of this industry analysis as a free report PDF download.

80% of our clients seek made-to-order reports. How do you want us to tailor yours?

Please enter a valid email id!

Please enter a valid message!

Switzerland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)