Switzerland Data Center Construction Market Size (2024 - 2029)

The Switzerland data center construction market is anticipated to experience growth, with an increase in market size driven by rising IT load capacity and expanded construction of raised floor areas. The market's expansion is further supported by the installation of a significant number of racks, particularly concentrated in Zurich. Factors such as cloud adoption, enhanced broadband connectivity, and growing digitization are contributing to the market's development, positioning Switzerland as a key player in the data center construction sector.

Market Size of Switzerland Data Center Construction Industry

Switzerland Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Forecast Data Period 2024 - 2029
Historical Data Period 2019 - 2022
CAGR (2024 - 2030) 5.35 %
Market Concentration Medium

Major Players

Switzerland Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

Switzerland Data Center Construction Market Analysis

The Switzerland Data Center Construction Market is expected to register a CAGR of 5.35% during the forecast period.

  • The upcoming IT load capacity of the Switzerland data center construction market is expected to reach 676.2 MW by 2029.
  • The country's construction of raised floor area is expected to increase by 2.6 million sq. ft by 2029.
  • The country's total number of racks to be installed is expected to reach 130,041 units by 2029. Zurich is expected to house the maximum number of racks by 2029.
  • In 2022, there were 93 colocation data center facilities in Russia. Moscow is the major hotspot, followed by St. Petersburg and others in the country. Some factors contributing to the growth of the data center in the country include cloud adoption, an increase in broadband connectivity, smartphone penetration, and growing digitization.

Switzerland Data Center Construction Industry Segmentation

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.

The Switzerland Data Center Construction Market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure [air-based cooling, liquid-based cooling, evaporative cooling], power infrastructure [UPS systems, generators, power distribution unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and by end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.

Tier Type
Tier 1 and 2
Tier 3
Tier 4
Data Center Size
Small
Medium
Large
Mega
Massive
Infrastructure
Cooling Infrastructure
Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Power Infrastructure
UPS Systems
Generators
Power Distribution Unit (PDU)
Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
End-User
IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Need A Different Region Or Segment?
Customize Now

Switzerland Data Center Construction Market Size Summary

The Switzerland data center construction market is experiencing steady growth, driven by the increasing demand for cloud computing and the integration of advanced technologies such as artificial intelligence, big data, and blockchain. The market is characterized by a moderate level of consolidation, with key players like Arup, DPR Construction, Legrand, KOHLER-SDMO, and AECOM playing significant roles. Zurich stands out as a major hub due to its status as a financial center and the presence of numerous startups in sectors like fintech, energy, and environment. The city's robust economic activities and the growing number of startups are expected to further bolster the data center market. Other cities in Switzerland, such as Geneva and Bern, are also witnessing developments in data center construction, supported by improved broadband connectivity and their status as important financial centers.

The market is projected to see a significant increase in IT load capacity, with the cloud segment expected to dominate the market share. The demand for data centers is fueled by the rising adoption of cloud services, particularly software-as-a-service (SaaS), which is becoming a preferred procurement model. The e-commerce and banking, financial services, and insurance (BFSI) sectors are also anticipated to contribute to the market's growth. The construction of new facilities, such as the Zurich Metro campus and expansions by companies like Equinix, highlights the ongoing investment in data center infrastructure. As the market evolves, hybrid cloud solutions are gaining traction, offering customized IT service mixes to meet diverse business needs.

Explore More

Switzerland Data Center Construction Market Size - Table of Contents

  1. 1. Market Dynamics

    1. 1.1 Market Overview

    2. 1.2 Market Drivers

      1. 1.2.1 5G Developments Fuelling Data Center Investments

      2. 1.2.2 Growing Cloud Servce adoption

      3. 1.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades

    3. 1.3 Market Restraints

      1. 1.3.1 Security Challenges Impacting Growth of Data Centers

    4. 1.4 Value Chain / Supply Chain Analysis

    5. 1.5 Industry Attractiveness - Porter's Five Forces Analysis

      1. 1.5.1 Threat of New Entrants

      2. 1.5.2 Bargaining Power of Buyers/Consumers

      3. 1.5.3 Bargaining Power of Suppliers

      4. 1.5.4 Threat of Substitute Products

      5. 1.5.5 Intensity of Competitive Rivalry

    6. 1.6 Assessment of COVID-19 Impact

  2. 2. MARKET SEGMENTATION

    1. 2.1 Tier Type

      1. 2.1.1 Tier 1 and 2

      2. 2.1.2 Tier 3

      3. 2.1.3 Tier 4

    2. 2.2 Data Center Size

      1. 2.2.1 Small

      2. 2.2.2 Medium

      3. 2.2.3 Large

      4. 2.2.4 Mega

      5. 2.2.5 Massive

    3. 2.3 Infrastructure

      1. 2.3.1 Cooling Infrastructure

        1. 2.3.1.1 Air-based Cooling

        2. 2.3.1.2 Liquid-based Cooling

        3. 2.3.1.3 Evaporative Cooling

      2. 2.3.2 Power Infrastructure

        1. 2.3.2.1 UPS Systems

        2. 2.3.2.2 Generators

        3. 2.3.2.3 Power Distribution Unit (PDU)

      3. 2.3.3 Racks and Cabinets

      4. 2.3.4 Servers

      5. 2.3.5 Networking Equipment

      6. 2.3.6 Physical Security Infrastructure

      7. 2.3.7 Design and Consulting Services

      8. 2.3.8 Other Infrastructure

    4. 2.4 End-User

      1. 2.4.1 IT & Telecommunication

      2. 2.4.2 BFSI

      3. 2.4.3 Government

      4. 2.4.4 Healthcare

      5. 2.4.5 Other End User

Switzerland Data Center Construction Market Size FAQs

The Switzerland Data Center Construction Market is projected to register a CAGR of 5.35% during the forecast period (2024-2029)

Arup, DPR Construction, Legrand, KOHLER-SDMO and AECOM are the major companies operating in the Switzerland Data Center Construction Market.

Switzerland Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)