United Kingdom Data Center Construction Market Size (2024 - 2029)

The United Kingdom data center construction market is anticipated to experience growth, with significant increases in market size over the forecast period. The expansion is driven by the rising IT load capacity and the development of raised floor space. Additionally, the market is set to see a substantial number of racks installed, particularly concentrated in London. The connectivity of the United Kingdom is further enhanced by numerous submarine cable systems, with several projects underway to bolster global connections.

Market Size of United Kingdom Data Center Construction Industry

United Kingdom Data Center Construction Market Summary
Study Period 2019 - 2029
Base Year For Estimation 2023
Forecast Data Period 2024 - 2029
Historical Data Period 2019 - 2022
CAGR (2024 - 2030) 5.05 %
Market Concentration High

Major Players

United Kingdom Data Center Construction Market Major Players

*Disclaimer: Major Players sorted in no particular order

United Kingdom Data Center Construction Market Analysis

The United Kingdom Data Center Construction Market is expected to register a CAGR of 5.05% during the forecast period.

The United Kingdom data center construction market is projected to register a CAGR of 5.05%.

  • The upcoming IT load capacity of the United Kindom data center construction market is expected to reach 3,609.7 MW by 2029.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 6.3 million sq. ft by 2029.
  • The country's total number of racks to be installed is expected to reach 316,056 units by 2029. London is projected to house the maximum number of racks by 2029.
  • There are close to 60 submarine cable systems connecting the United Kingdom to the globe, and many are under construction. One such submarine cable, estimated to be built by the end of 2023, is 2Africa, which stretches over 45,000 Kilometers spread across Asia, the Middle East, and Africa with the United Kingdom.

United Kingdom Data Center Construction Industry Segmentation

A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with those applications and services. Under data center construction, we are tracking the capital expenditure that was incurred while building the existing data center facilities and also estimating the future capex based on upcoming data center facilities.

The United Kingdom Data Center Construction Market is segmented by tier type (tier 1 and 2, tier 3, and tier 4), by data center size (small, medium, large, massive, and mega), by infrastructure (cooling infrastructure (air-based cooling, liquid-based cooling, evaporative cooling), power infrastructure (UPS systems, generators, power distribution unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure), and by end user ( IT & telecommunication, BFSI, government, healthcare, and other end user). The market sizes and forecasts are provided in values of USD for all the above segments.

Tier Type
Tier 1 and 2
Tier 3
Tier 4
Data Center Size
Small
Medium
Large
Mega
Massive
Infrastructure
Cooling Infrastructure
Air-based Cooling
Liquid-based Cooling
Evaporative Cooling
Power Infrastructure
UPS Systems
Generators
Power Distribution Unit (PDU)
Racks and Cabinets
Servers
Networking Equipment
Physical Security Infrastructure
Design and Consulting Services
Other Infrastructure
End-User
IT & Telecommunication
BFSI
Government
Healthcare
Other End User
Need A Different Region Or Segment?
Customize Now

United Kingdom Data Center Construction Market Size Summary

The United Kingdom data center construction market is experiencing a steady growth trajectory, driven by increasing demand for digital infrastructure and cloud services. The market is characterized by significant investments in data center facilities, particularly in London, which remains the primary hub for data center activities in the country. The digital economy's contribution to the UK's GDP underscores the growing need for advanced data processing capabilities, with cloud and telecom sectors holding substantial market shares. The government's digital strategy and substantial investments from major tech companies like Amazon Web Services further bolster the market's expansion, highlighting the UK's commitment to enhancing its digital infrastructure.

Despite London's dominance, there is a noticeable shift towards other regions such as Scotland, Manchester, and Wakefield, driven by the need for cost-effective solutions in power and cooling systems. This diversification is supported by the increasing adoption of digitalization across the UK, with cities like Bristol emerging as significant tech hubs. The market is fairly consolidated, with key players like Castrol Limited and Alfa Laval Ltd leading the charge. Recent developments, including new data center projects by firms like Datum Group and Glencar, are expected to create further opportunities for market vendors, ensuring continued growth and innovation in the UK's data center construction sector.

Explore More

United Kingdom Data Center Construction Market Size - Table of Contents

  1. 1. Market Dynamics

    1. 1.1 Market Overview

    2. 1.2 Market Drivers

      1. 1.2.1 5G Developments Fuelling Data Center Investments

      2. 1.2.2 Growing Cloud Servce adoption

      3. 1.2.3 Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades

    3. 1.3 Market Restraints

      1. 1.3.1 Security Challenges Impacting Growth of Data Centers

    4. 1.4 Value Chain / Supply Chain Analysis

    5. 1.5 Industry Attractiveness - Porter's Five Forces Analysis

      1. 1.5.1 Threat of New Entrants

      2. 1.5.2 Bargaining Power of Buyers/Consumers

      3. 1.5.3 Bargaining Power of Suppliers

      4. 1.5.4 Threat of Substitute Products

      5. 1.5.5 Intensity of Competitive Rivalry

    6. 1.6 Assessment of COVID-19 Impact

  2. 2. MARKET SEGMENTATION

    1. 2.1 Tier Type

      1. 2.1.1 Tier 1 and 2

      2. 2.1.2 Tier 3

      3. 2.1.3 Tier 4

    2. 2.2 Data Center Size

      1. 2.2.1 Small

      2. 2.2.2 Medium

      3. 2.2.3 Large

      4. 2.2.4 Mega

      5. 2.2.5 Massive

    3. 2.3 Infrastructure

      1. 2.3.1 Cooling Infrastructure

        1. 2.3.1.1 Air-based Cooling

        2. 2.3.1.2 Liquid-based Cooling

        3. 2.3.1.3 Evaporative Cooling

      2. 2.3.2 Power Infrastructure

        1. 2.3.2.1 UPS Systems

        2. 2.3.2.2 Generators

        3. 2.3.2.3 Power Distribution Unit (PDU)

      3. 2.3.3 Racks and Cabinets

      4. 2.3.4 Servers

      5. 2.3.5 Networking Equipment

      6. 2.3.6 Physical Security Infrastructure

      7. 2.3.7 Design and Consulting Services

      8. 2.3.8 Other Infrastructure

    4. 2.4 End-User

      1. 2.4.1 IT & Telecommunication

      2. 2.4.2 BFSI

      3. 2.4.3 Government

      4. 2.4.4 Healthcare

      5. 2.4.5 Other End User

United Kingdom Data Center Construction Market Size FAQs

The United Kingdom Data Center Construction Market is projected to register a CAGR of 5.05% during the forecast period (2024-2029)

Castrol Limited, Alfa Laval Ltd, Airedale International Air Conditioning, Datacentre UK and Sweco AB are the major companies operating in the United Kingdom Data Center Construction Market.

United Kingdom Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2024-2030)